| 1 | Providing one Coil Earth using No.8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Erection of suspension clamp for 11KV ABC of any size |
| 3 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 4 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 5 | Fiting One no MVT on existing cross armexcluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 6 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 numbers of poles excluding loading & unloading charges |
| 7 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 8 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carrying up to 2 drum including loading and unloading using crane |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 10 | Fitting and erecting one HT 'A' type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 11 | Renewing one damaged PSC/RCCTransformer DP structure with a new 'A' type Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipeearthing. |
| 12 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides |
| 13 | Fitting and erecting one HT Double PoleStructure using 'A' type pole in positionincluding fitting 2 No. channel cross arm,digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Dismantling (without damage) one LTPSC/RCC Strut pole including removal of clamps and stacking |
| 16 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision for earthing. |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 19 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 20 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil |
| 21 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 22 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 23 | Cleaning and levelling of transformeryard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 24 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 25 | Providing WP support with PSC poleincluding digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 26 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 27 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 28 | Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 29 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 30 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 31 | Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 32 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 33 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 34 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 35 | Stringing of 11KV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles |
| 36 | Fitting one no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 KV AB cable. |
| 37 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single pole including conveyance of materials. |
| 38 | Erection of Anchor clamp/ dead end clamp for 11 KV ABC of any size |
| 39 | Additional rate for excavation of one Pit for Coil Earthing in Soft Rock. |
| 40 | Providing one Earth using GI earth pipe of size 40mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. (excludes cost of earthpipe, earthchamber and covering slab). |
| 41 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 42 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 43 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 44 | Providing Cable Tie |
| 45 | Reshackling one span LT OH Additionalconductor including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials complete. |
| 46 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 47 | Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials. |
| 48 | Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials. |
| 49 | Additional rate for excavation of Pit for A type pole in hard Laterite |
| 50 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 51 | Dismantling one section fuse from structure and bringing back to section store Please Enable Macros to View BoQ information |