| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 6 | Transporting poles by hired vehicle to adistance beyond 5km and carrying upto 4numbers of poles. (Running km) |
| 7 | Fitting and erecting one HT Double PoleStructure using 'A' type pole in positionincluding fitting 2 No. channel cross arm,digging and back filling pit in ordinary soil,drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 8 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 9 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 10 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing),drawing earth leads |
| 11 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 12 | Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No |
| 13 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 15 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11KV DP incl. conveyance of materials. |
| 16 | Additional rate for excavation of Pit for A type pole in Laterite |
| 17 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 18 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 19 | Disconnecting and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 20 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 21 | Additional rate refitting/redoing shackle Set including reshackling one span while renewing any type of LT pole |
| 22 | Additional rate for providing one disc set,PG clamp etc complete on any type of HT pole for making cut point |
| 23 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials |
| 24 | Providing/Inserting 2 line spacer on theexisting LT OH line. |
| 25 | Providing/Inserting 3 line spacer on theexisting LT OH line. |
| 26 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 27 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 28 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling treesincluding cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 29 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store |
| 30 | Fitting one set (3No.) 11kV LA and givingconnections excluding earthing |
| 31 | Fitting one Additional V cross arm in existing single pole including conveyance of materials |
| 32 | Additional rate for providing one F top bracket complete, on any type of HT pole. |
| 33 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 34 | Stringing of one km 3 PH 11 kV line with XLPE insulated ACSR Racoon or equivalent ( 3 conductors) after fitting insulators,binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works |
| 35 | Providing bridging at Cut points for 3 PH11kV line with XLPE Insulated ACSR Raccoon or equalant (1 conductors) using IPC and respective conductors |
| 36 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 37 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 38 | Object Marking (traffic signal painting) in one LT, HT, HT/LT pole for a height of 1.5m from ground level using approved quality primer one coat and two coats anti algal black and fluorescent white paint in alternate rings of 25cm width including cost of paints. |
| 39 | Pole numbering using printed Aluminiumsheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and lettersshould be in black synthetic enamel paint.The size of the number should be at least2cm in height x 1.5cm in width. including cost of paint |
| 40 | Transferring LT 3 phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 41 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 42 | Dismantling (without damage) LT stayincluding digging pit in all classes of soil and backfilling. |
| 43 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line |
| 44 | Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 45 | Additional rate for excavation of one Pit for HT pole/ HT stay in hard laterite |
| 46 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite |
| 47 | Additional rate for excavation of Pit for A type pole in hard Laterite |
| 48 | Additional rate for excavation of one Pit for HT pole/ HT stay in laterite Please Enable Macros to View BoQ information |