| 1 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating by ramming and watering. |
| 2 | Cost of construction of foundation, base plates, fixing anchor bolts, loading & unloading, handling, erection, alignment and allied works for the installation of RMU/Panel. |
| 3 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm. |
| 4 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames and GI flat/MS rods. |
| 5 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit and backfilling. |
| 6 | Welding one end of bended GI strip with the riser of already laid earth mat and connecting other end with nuts & bolts. |
| 7 | Earth work in excavation by mechanical/manual means in foundation trenches or drains including dressing and ramming. |
| 8 | Close timbering in trenches including strutting, shoring and packing cavities. |
| 9 | Earth work filling - Supplying contractors own earth and filling in layers not exceeding 20 cm in depth. |
| 10 | Lifting and stacking earth by manual labour including loading unloading for lead less than 50m. |
| 11 | Lifting and stacking earth by manual labour including loading unloading for beyond 100m. |
| 12 | Providing and laying in position cement concrete 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate). |
| 13 | Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4. |
| 14 | Providing and laying in position reinforced cement concrete 1:1.5:3 up to plinth level. |
| 15 | 12 mm cement plaster of mix: 1:4 (1 cement : 4 fine sand). |
| 16 | Finishing walls with Premium Acrylic Smooth exterior paint (Two or more coats). |
| 17 | Steel reinforcement for R.C.C work (TMT bars Fe-500D or more) including cutting, bending and placing. |
| 18 | Providing and fixing bolts including nuts and washers complete. |
| 19 | Steel work in built up tubular trusses including cutting, hoisting, fixing and priming. |
| 20 | Transporting and erecting 11KV indoor VCB/SF6 switchgear panel and accessories. |
| 21 | Interconnection of panels and 11KV bus bars, earthing, and inter panel wiring. |
| 22 | Uncoiling and laying 19/20 core 2.5sqmm / 12 core 4 sqmm control cable through trench/pipe. |
| 23 | Uncoiling and laying 12/7/6 core 2.5 sq mm control cable through trench/pipe. |
| 24 | Uncoiling and laying 4/2 core 2.5sqmm control cable through trench/pipe. |
| 25 | Uncoiling and laying 5/4/3/2 core 4sqmm control cable through trench/pipe. |
| 26 | Fixing terminal connecting strip with connectors in marshalling box or panel. |
| 27 | Termination of 19/20 core 2.5sqmm / 12 core 4 sqmm cables using glands. |
| 28 | Termination of 12/7/6 core 2.5 sqmm cable using 25mm gland. |
| 29 | Termination of 4/2 core 2.5/4 sq mm cable using 16-22mm gland. |
| 30 | Termination of 2.5 mm² control cable including ferrules, lugs and connecting to terminals. |
| 31 | Termination of 4.0 mm² control cable including ferrules, lugs and connecting to terminals. |
| 32 | Supplying and fixing aluminium cable tags with punched numbering. |
| 33 | Making and fixing cable clamps using 25x3 mm GI strip including nuts and bolts. Please Enable Macros to View BoQ information |