| 1 | Providing one Coil Earth using No.8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Loading HT 'A' type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). |
| 3 | Additional rate for excavation of Pit for 'A' type pole in Laterite. |
| 4 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 5 | Fitting one Additional V cross arm in existing single pole including conveyance of materials |
| 6 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 numbers of poles excluding loading & unloading charges |
| 7 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 8 | Additional rate for providing one F top bracket complete, on any type of HT pole. |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 10 | Fitting and erecting one HT 'A' type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 11 | Fitting one Additional 2.4m Channel cross arm in existing single pole including conveyance of materials. |
| 12 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides |
| 13 | Fitting and erecting one HT Double PoleStructure using 'A' type pole in positionincluding fitting 2 No. channel cross arm,digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Dismantling (without damage) one LTPSC/RCC Strut pole including removal of clamps and stacking |
| 16 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision for earthing. |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Dismantling (without damage) LT stayincluding digging pit in all classes of soil and backfilling. |
| 19 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 20 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil |
| 21 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 22 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 23 | Pole numbering using printed Aluminiumsheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 24 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 25 | Dismantling one damaged 11 kV PSC/RCC pole after disconnecting stays, strut, etc. attached thereon and stacking the same |
| 26 | Additional rate for refitting/redoing oneShackle Set, including reshacling one span, while renewing any type of LT pole. |
| 27 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 28 | Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 29 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 30 | Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 31 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 32 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 33 | Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 34 | Cutting trees having girth beyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 35 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 36 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 37 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single pole including conveyance of materials. |
| 38 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials(except poles) from stacking place. |
| 39 | Dismantling (without damage) one km LTthree phase 4 wire OH line conductor bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 40 | Dismantling (without damage) one km LTadditional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 41 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. for one km additionalconductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 42 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 43 | Dismantling (without damage) one km LTsingle phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 44 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 45 | Providing one Earth using GI earth pipe of size 40mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand upto 90cm from the bottom and providing earth chamber with covering slab. (includes the cost of 20kg salt, 25kg charcoal but excludes cost of earth pipe earth chamber and covering slab). |
| 46 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 47 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 48 | Stringing of one km 11kV line with ACSRRaccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 49 | Additional rate for excavation of Pit for A type pole in hard Laterite |
| 50 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 51 | Dismantling one section fuse from structure and bringing back to section store Please Enable Macros to View BoQ information |