|
| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 2 | providing and laying cement concrete in 1:6:12 (1 cement: 6 coarse sand :12 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.1). |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). |
| 4 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (PWD SOR 2025-26, Chapter-5, Item No.12) |
| 5 | M-15 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (SOR/ PWD 2025-26 Chapter No. 6 SI No. 2)) |
| 6 | M-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work add extra to item No.1 to 4 above for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm( PWD SOR 2025-26, chapter-5, SI No. 2+5) |
| 7 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chapter-5, Item No.12) |
| 8 | Rcc work in wall (any thickness) including attached plasters, buttreses, plinth and string courses, fillers, clumns, pillars...................................................... All complelte |
| 9 | Earth filling work with 10km cartage..................... Including all complete. |
| 10 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse |
| 11 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand ( Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level...... All complete.(PWD/SOR 2025-26 Chapter No-07 SI No. 2) |
| 12 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 13 | Mild steel, and iron work of small size and section auch as holding down wood, hold fassts tierods,grating, etc (when not in and overall rates) brought to required from inncluding supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of holes in door chaukhats and nosing(DSR 2023-24, 10.01) |
| 14 | Mild steel, and iron work in heavy size such built up gates record reck, roof work, gates etc. brought to required from inncluding drilling holes reviting or welding where necesarry and also including supply of steel bolts, nuts wastage etc. and their fixing require for proper completion of the work (DSR 2023-24, 10.01) |
| 15 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.(DSR 2023-24, 12.1.1) |
| 16 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). |
| 17 | Providing and laying cement concrete in 1:2:4 with cement, coarse, sand and 20 mm guage stone........................... All complete. |
| 18 | finishing walls with putty approved brand ............................ All complete. (SOR 2025-26 S.No. 31) |
| 19 | finishing walls with Exterior emulsion paint (Apex) of approved brand............................ All complete. (SOR 2025-26 S.No. 31) |
| 20 | Painting two coat over priming two coat (but excluding cost of priming coat) on steel and other materl surface upto 10cm width or girth or small articls not exceeding .10 sqm in area with superior synthetic enamel such as Luxol 3, Hi gloss apcolite, Superlac, dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other forign matter sand papering and scrapping including cost of all materials, labour, tools and plants etc required for proper completion of work. (PWD SOR 2022-23, chapter -15 item no 2 |
| 21 | M.S Speciefication Board including painting & writing |
| 22 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |