| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect diffrent utilities like sewar line ,Water supply line ,Electric cable,Telephone cable, Gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of engineer in charge All kinds of soil. |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (Zone-III) drived from natural sources : 8 graded stone aggregate 40 mm nominal size drived from natural sources). |
| 5 | Providing and laying factory made coloured chamfered edge Cement Concrete paver blocks of required strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of fine sand, compacting and proper embedding/laying of inter locking paver locks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. complete as per manufacturer's specifications & direction of Engineerin- Charge. 60mm thick C.C. paver block of M-35 grade with approved colour, design & pattern.60mm thick Cement concrete paver block of M-35 grade with approved colour, design & pattern. |
| 6 | Brick work with Common Brunt clay F.P.S( Non- modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement :4 coarsesand) |
| 7 | Providing and laying in position cement concrete of cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement: 3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 9 | 12 mm cement plaster of mix:1:4 (1 cement: 4 coarse sand) |
| 10 | Neat cement punning |
| 11 | Providing Wall putty on new surface with approved qualit material of Berger/ J.K. / Birla or similar make 2coats. |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. |
| 13 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. |
| 14 | Construction of granular sub-base by providing close graded material, spardingin uniform layers with motor grader on prpared surface, mixing by mix in place method with front and loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401. |
| 15 | Providing, Laying, Spreading and compacting graded stone aggregate to wet mix macadam specification including premixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver ir/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 16 | Providing and applying tack coat using bitumen emulsion using emulsion pressure distributer at the rate of 0.25kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 17 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 18 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 19 | Fabrication & Manufacturing of Prestressed Hollow Core slab (Hollow area 25 to 30%) of different thickness & modular width 1200 mm in Controlled Factory Environment with approved methodology informing to IS 10297- 1982 conforming to IS : 10297-1982 by using long line casting method having arrangement of proper steel bed. Concreting should be done by batch mixing plant capable of producing zero slump concrete, transported through automatic shuttels of standard make & layed on bed with the help of extruder/Slipformer, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in slab element after achieving equired strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of strands should be paid separately).Note : Excess/ less cement over the specified cement contentused as per design mix is payable / recoverable separately. |
| 20 | Providing and fixing saucer drain of size 600x300x100 mm (along the sides) in PCC (1:1.5:3) complete and provide proper slopes to drain of rain water on the top of drain including all the lead of rain water on the top of drain including all lead lifts etc,complete for the finished item of work as per the direction of Engineer-in-charge.Note:(No separate measurements will be considerd for the excavation. |
| 21 | Supply of Crane 20 Tonne Capacity at site in hire bassic including cost of desiel and driver etc.complete in all respect as per direction of engineer in -echarge. Please Enable Macros to View BoQ information |