| 1 | Earth work in excavation including initial lead upto 30 m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. |
| 2 | Centering & shuttering for P.C.C. including cost of Shuttering, T&P etc. for complete work. |
| 3 | P C C 1:3:6 With Cement course sand 4.75 to 20 mm gauge kabrai stone grit including cost of matarial labour and t&p etc. |
| 4 | M-150 1st Class Brick work in 1:4 cement mortar including cost of material ,labour T&P etc for complete work. |
| 5 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in single storey building finish even & smooth including all cost of material labour T& P etc for complete work. |
| 6 | Providing and laying outlet for 110 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. |
| 7 | Providing and laying outlet for 160 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. |
| 8 | Dry earth filling including manual compaction dressing lead up to 30 mt lift up to 1.50 in trench of outlet. |
| 9 | Struck deep cement pointing in 1:2 cement mortar including all cost of material labour T&P etc for completion of work. |
| 10 | Providing & Fixing upto 2.00 sqm steel gate on head including cost of all material labour and T&P etc. required for completion of work. |
| 11 | Painting of Super structure of gates by applying one coat of red oxide zinc chromate primer and two coat of high class synthetic enamel japani black paint of standard make after proper cleaning scrapping the surface including cost of material labour T& P and scaffolding bridges with proper safety arrangement as required for proper completion of work. |
| 12 | Cleaning thick jungle and thorney bushes without uprooting |
| 13 | Construction of subgrade and earthen shoulders with approved material obtained from pits with all lift and leads transporting to site spreading grading to required slope and compacted. with lead upto 30m & lift upto 1.5m Including all cost of labour Material T&P etc. Required for Proper completion of work |
| 14 | Earth work in making Daula with manual compaction dressing by any means lead upto 30 m & lift upto 1.50m. |
| 15 | Providing & filling of local sand including all lead & lift with machinical compaction, labour T & P etc. |
| 16 | Dry brick on edge pitching (Class-150) including preparation of sub grade and filling joints with local sand including cost of materials labour T & P etc. |
| 17 | Laying CC 1:4:8 in foundation of wall with cement, coarse sand and 10-20mm size stone ballast including cost of all materila, labourand T&P etc for completion of work. |
| 18 | Painting on parapets with Acrylic paint with approved brand (two coats) with one priming coat after thoroughly brushing the surface free from dropping and other foreign matter including preparing the surface even and sand papered smooth including cost of all material labour T&P etc required for proper completion of work |
| 19 | E/W in strengthening of bank of Tikra DY with dressing upto Profile including all lead lift & T & P etc. complete Please Enable Macros to View BoQ information |