| 1 | Dimolishling of old & damaged VRB including Dimolishling of RCC slab brick work of abatment PCC of foundation with its. proper disposal all complete the work as per direction Engineer-in-charge.(A) Dismantling reinforced cement concrete including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M. |
| 2 | (B) Dismanteling brick work or stone work in lime or cement mortar including stacking of materials as directed by Engineer-In-Charge within a distance of 60m. |
| 3 | (C) Breaking brick ballast (25mm to 40mm size) 40mm gauge excluding cost of Bricks |
| 4 | (D) Dimolishling of C.C. Work 1.4.8 OR LEANER MIX |
| 5 | (E) Extra for Cutting rienforcement bars in RCC work mannually or mechanical means including stacking of materials as directed by Engineer-In-Charge within a distance of 60m. |
| 6 | Earth work in excavation of foundation in all type of soil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all meterial Labour T & P etc. |
| 7 | Hiring 5 HP Deisel pump for dewatering including suction pipe its cartage POL and operator etc. complete work. |
| 8 | P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 3 Coarse sand & 6 Stone aggregate 20mm to 40mm size) including cost of all meterial Labour, T & P etc. required for proper completion of the work. |
| 9 | Centering and Shuttering for R C C work including rent of shuttering material labour and T & P required for proper completion of work for slab and wall |
| 10 | Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. |
| 11 | P/L R.C.C. with cement coarse sand and 20 mm gauage approved stone aggregate in the proportion of 1:1.5:3 (1 Cement, 1.5 Coarse sand & 3 Stone aggregate 20mm size) in footings of foundations vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I. Cost of binding wire shall also be included in this Item. |
| 12 | Providing and laying in position cement concrete 1.1.5.3 for wearing coat of specified grade excluding the cost of centering and shuttering. |
| 13 | Brick Work in 1:4 cement and c. sand morter with M-150 Bricks including cost of all material, labour and T&P etc. all Complete the work as per direction of Engineer-in-charge. |
| 14 | Struck pointing with 1:2 Cement and fine sand mortor including supply of material, labour and T&P. etc. all complete the work. As per direction of Engineer-in-charge. |
| 15 | Finishing walls with the water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all material , Labour & T&P etc. required for proper completion of work. |
| 16 | Supply and fixing 100 mm dia P.V.C spoute pipe i/c all required labour, material and T&P to complete the work. Class-B standard make kisan or equvalant |
| 17 | Providing and Laying 150 mm thick brick ballast 25 to 40 mm gauge as filter i/c cost of material labour, T&P etc. all complete the work.(i) Excluding Cost of material |
| 18 | (ii) With material |
| 19 | Earth work in correcting section of Canal i/c all lead and lift manual completion and proper dressing & also including all required labour and T&P all complete the work as per direction of E/I. |
| 20 | Earth work in excavation or embankment in Road Diversion including all labour, and T&P required for proper completion of the work as per direction of Engineer-in-charge Please Enable Macros to View BoQ information |