| 1 | Making Bandha with Diversion of water ……..………Complete |
| 2 | Dismantling of Old Brick Work |
| 3 | Making Bandha with Diversion of water ……..………Complete |
| 4 | Dewatering form nala using pump set ……..………Complete |
| 5 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift up to 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the space between thebuildingand the sides of foundation trenches or into the plinth and removal anddisposal of surplus earthas directedby the Engineer In-charge upto a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 6 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2017-18, Chepter-3, Item No. 231a ) |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) |
| 8 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) |
| 9 | Supply & Laying precast concrete blocks (Interlocking Tiles) for paving of thickness 100mm (Compresive strength not less then 30 mpa) Including 25 mm theick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) |
| 10 | Finishing Wall with Putty approved brand and manufacture and of required shade on undacoreted …......................... All complete. (PWD SOR 2025-26 Chapter No-08 Item No. 31 Spec. New). |
| 11 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacoratedwall surface togive evenshade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75 Ltr/ 10 sqm coat curing and cos to fall material, labour, T&P etc. required for proper completion of work.for two coat. (PWD SOR 2025-26 SNo. 35 New). |
| 12 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). |
| 13 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). |
| 14 | M.S Speciefication Board including painting & writing |
| 15 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |