| 1 | nSoh; vkink@Hkkjh cjlkr@rst gokvksa ls {kfrxzLr ykbZuksa dh ejEer ,oa iwoZfuekZ.k dk dk;ZA |
| 2 | Safe Loading, Carriage & Unloading of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 0-60 km |
| 3 | Safe Loading, Carriage & Unloading of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 0-60 km |
| 4 | Erection of 11 mtr Single ST Pole with all accessories (Cross arm, pin insulator with pin, F-bracket etc.) as per specification. |
| 5 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 6 | Remains Line Metarial |
| 7 | Plinth of 11 mtr ST Pole as per specification. |
| 8 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 9 | Laying sagging and binding of 33 kv line ACSR Weasel Conductor HT 3 Phase 3 Wire on eracted pole |
| 10 | Laying sagging and binding of ACSR Weasel Conductor HT 3 Phase 3 Wire on eracted pole |
| 11 | Laying sagging and binding of LT Line 3 Phase 4 Wire Conductor on eracted pole |
| 12 | Work of Strengthening 10/25/63/100 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 13 | Work of Transformer Plinth Strengthening 250/400/630 KVA Distribution Transformer as per specification |
| 14 | Work of Transformer Fancing Strengthening 250/400/630 KVA Distribution Transformer as per specification |
| 15 | Intallation of Stay set complete as per specification |
| 16 | Providing and Installation of V-type X-arm holding clamp with nut bolt |
| 17 | Dismentling & Refitting of X Arm |
| 18 | Dismentling of Damaged 11 KV & LT Line Pole |
| 19 | 11 KV Line Guarding as per specification. |
| 20 | Providing and Installation of F bracket on erected PCC/ST Pole |
| 21 | Providing and Installation of LT Clamp |
| 22 | LT Insulator |
| 23 | Providing and Installation of Nut & Bolt |
| 24 | DC/RC of consumer service cable Please Enable Macros to View BoQ information |