| 1 | Cleaning thick jungle and thorney bushes without uprooting including all cost of labour T & P etc. required for proper completion of work. |
| 2 | Earth work in cutting / filling in Daula including all lead & lift with manual campaction dressing ,all cost of labour T & P etc. required for proper completion of work. |
| 3 | Earth work in cutting / filling in embankment including all lead & lift with mechanical campaction dressing ,all cost of labour T & P etc. required for proper completion of work. |
| 4 | Providing & filling local sand / silt with mechanical compaction dressing including all cost of labour T & P etc. required for proper completion of work. |
| 5 | Dry brick on edge pitching (Class-150) including preparation of sub grade and filling joints with local sand including cost of materials, labour, T & P etc. required for proper completion of work. |
| 6 | Earth work in excavation including including all lead & Lift, labour,T& P with manual compaction and dressing to profile. required for proper completion of work. |
| 7 | Centering & shuttering for P.C.C. including cost of Shuttering, T&P etc. for complete work. required for proper completion of work. |
| 8 | Providing & laying P.C.C. 1:3:6 With Cement course sand 4.75 to 20 mm gauge kabrai stone grit including cost of matarial labour and t&p etc. required for proper completion of work. |
| 9 | Brick work in 1:4 cement mortar with 1 cement, 4 coarse sand & Ist class brick including cost of all material labour and T & P etc.required for proper completion of the work. |
| 10 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall including all cost of material labour T& P etc.required for proper completion of work. |
| 11 | Providing & laying outlet for 110 mm dia HDPE Pipe PN-6 Class PE-100 including all cost of material, labour T & P etc. requred for proper competion of work. |
| 12 | Providing & laying outlet for 160 mm dia HDPE Pipe PN-6 Class PE-100 including all cost of material, labour T & P etc. requred for proper competion of work. |
| 13 | Centering & shuttering for R.C.C. work including rent of shuttering, material, labour and T&P Required for completion of work etc .required for proper completion of work. |
| 14 | Providing & Laying P.C.C. 1:3:6 with cement coarse sand & 20 to 40 mm size stone ballast in foundation including cost of all material ,labour and T&P etc. required for proper completion of work. |
| 15 | Providing & Laying R.C.C. 1:1.5:3 with 13.20 to 20 mm stone grit excluding cost of steel but including cost of all labour T&P etc.required for proper completion of work. |
| 16 | Providing,cutting, bending, binding & placing of steel reinforcement work including cost of binding wire all material, labour and T&P etc. required for proper completion of work. |
| 17 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required including priming coat including cost of all labour T&P etc.required for proper completion of work. |
| 18 | Writting letters above 8cm and upto 15 cm size complete including supply of all material labour & T&P etc..required for proper completion of work. |
| 19 | Providing & Fixing Sign board with fabrication and supply of material angle 35x35x5mm iron sheet 18G with one red oxide primer including cost of all material labour and t&p etc,required for proper completion of work. |
| 20 | Earth work in strengthening for right bank cutting / filling including all lead & lift with manual campaction dressing ,all cost of labour T & P etc.equired for proper completion of work. |
| 21 | Preparation of sub grade for lining work including cost of all material labour T&P etc. |
| 22 | Centering and Shuttering for sleeper including cost of all material labour T&P etc. |
| 23 | Cutting, bending, placing and binding of steel reinforcement including cost of all labour, material, T&P, M.S. binding wire for proper completion of work. |
| 24 | Laying CC in M-20 1:1.5:3 for sleeper 200x150 including cost of all material, lead, lift, labour, T&P etc. |
| 25 | Supply and laying LDPE film 200 micron thick in bed and side slope over filler material including cost of all material, labour etc. required for proper completion of work. |
| 26 | Laying 100 mm thick CC M-20 grade for lining by manual in bed and side slope including cost of all material, labour etc. required for proper completion of work. Please Enable Macros to View BoQ information |