| 1 | Cleaning thick jungle and thorney bushes without uprooting including cost of all labour and T&P etc. required for proper completion of work. As per direction of Engineer -in -charge. |
| 2 | Earth work in excavation of foundation including all lead & lift, labour and T&P etc with manual compaction and dressing to profile. As per direction of Engineer -in -charge. |
| 3 | Construction of sub grade by earthen shoulders with all lead & lift including Mechanical compaction and all cost of labour, T&P etc. Required for Proper completion of work |
| 4 | Earth work in making Daula with manual compaction dressing by any means lead upto 30 m & lift upto 1.50m. As per direction of Engineer -in -charge. |
| 5 | Providing & filling of local sand including all lead & lift with machinical compaction, labour T & P etc. |
| 6 | Dry earth filling including manual compaction dressing all lead & lift in trench of outlet. including all lead upto & lift, labour and T&P etc As per direction of Engineer -in -charge. |
| 7 | Providing & Laying P.C.C 1:3:6 in foundation of wall with cement, coarse sand and 10-20 mm size stone ballast including cost of all material, labour and T&P etc. required for proper completion of work. |
| 8 | Providing & Laying M-150 1st Class Brick work in 1:4 cement mortar including all cost of material ,labour T&P etc,required for completion of work. As per direction of Engineer -in -charge. |
| 9 | Dismantalling brick work in lime or cement mortar including stacking of materials with all lead & lift etc. as directed by engineer-in- charge . |
| 10 | Centering & shuttering for RCC work other than building including all cost of material & labour and T&P etc.For bridge slabs above 3.0 meter span Required for completion of work . As per direction of Engineer -in -charge. |
| 11 | Cement concrete with stone ballast in R.C.C. work 1:2:4 including cost of material but inclusive of labour charge and T&P etc complete. |
| 12 | Struck deep cement pointing on brick work in 1:2 C.M. , coarse sand including cost of all material labour and T&P etc. required for completion of work. |
| 13 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 13.47.1 New work (Two or more coats applied @ 1.43 lt l0 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 14 | Writting letters above 8cm and upto 15 cm size complete including supply of all material labour & T&P etc. |
| 15 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in outlet finish even & smooth including all cost of material labour T& P etc for complete work. |
| 16 | Providing and laying outlet for 110 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. |
| 17 | Providing and laying outlet for 160 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. |
| 18 | Providing and laying outlet for 90 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. |
| 19 | Dry Brick on edge pitching (class - 150) including preparation of sub grade and filling joints with local sand including cost of materials labour T & P etc. |
| 20 | Providing & fixing upto 2.00 Sqm steel gate on head including cost of all material labour and T&P etc. required for completion of work. |
| 21 | Providing & fixing upto 3.50 Sqm steel gate on head including cost of all material labour and T&P etc. required for completion of work. |
| 22 | Providing & fixing upto 5.50 Sqm steel gate on head including cost of all material labour and T&P etc. required for completion of work. |
| 23 | Earth Work in strenghthening of Right bank with dressing lead upto 30 m and lift upto 1.5 m excluding Mechanical comapction but inclusive of manual compaction and dressing to profile etc. As per direction of Engineer -in -charge. Please Enable Macros to View BoQ information |