|
| 1 | Supply and fixing of Automated dosing system for sewage water treatment with Dosing Pumps (Edose, 1000 LPH) 3 use + 3 standby, Sensors – TDS, Turbidity, DO (Gravity Brand), IOT Module with Circuit Board, Water Level Sensors for Dosing Tanks and Feeder Tanks ,CPVC square Tanks for Dosing 1no. 1000 lit. and 2no. 2000 lit. capacity,3 no. Feeder Pumps (0.5 HP) including Rain sensor based acturators with programmed automated software for flow control based dosing ,CCTV camera with HD and DVR and water flowe sensor for calculation of discharge water quantity in MLD, Water Level Sensors for Dosing Tanks and Feeder Tanks ,all machines fitted in MS Based Automation Plant Unit (10 feet x 20 feet x 8 feet) with powder coated and two screw conveyor for sludge removal including all cost of material ,labour ,T&P etc all complete. |
| 2 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.As per DSR No.- 10.1 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil)As per DSR-2.1.1 |
| 4 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete.As per DSR-2.27 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR-4.1.8 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) :.As per DSR-5.2.2 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars.As per DSR-5.22.1 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns.As per DSR-4.3.1 |
| 9 | Maintenance cost per MLD of sewage water treatment per day Please Enable Macros to View BoQ information |