| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, ESWC, Aligarh. Name of Work: Construction of 33KV line from 132 KV S/S Boner to 33/11 KV S/S Swarn Jayanti Nagar Under Business Plan 2026-27 (Semi Turn Key Basis) Turn Key E-Tender No: ESWCA-04/2026-27 |
| 2 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Work Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rates Quoted Per Unit with GST & All Taxes Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT With GST & All Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 3 | Safe carriage, loading, unloading, dragging & stacking of following material from store center to contractors dump site to pit site as per requirement. |
| 4 | 33 KV Polymeric Pin Insulator |
| 5 | 33 KV Polymeric Disc Insulator 70 kn |
| 6 | 33 KV Disc Fitting 70 kn |
| 7 | ACSR Dog Conductor |
| 8 | ST Pole 11 Mtr Long SP-72 |
| 9 | ST Pole 13 Mtr Long SP-72 |
| 10 | 33 KV XLPE cable 3x300 sq mm |
| 11 | M.S Earthing Complete (20x2540mm) |
| 12 | 33 KV V-Type Cross Arm 100x50mmX6mm |
| 13 | G.I. Wire 6 SWG |
| 14 | G.I. Wire 8 SWG |
| 15 | 33KV Line Isolator 800 Amp. |
| 16 | Complete Stays (Stay Set, GI Stay rod 20x1800, Stay wire 7/8 SWG 10 kg, Stay Clamps and Nut bolt & washer |
| 17 | Supply & providing of following Material & including Miscellaneous line items requried of line makeing (Electrical Work As Per RESPO Norms & Drawing. ) :- |
| 18 | HDPE pipe (200 mm DIA) for UG layimg of 3x300 sq mm 33 kv XLPE cable |
| 19 | 33 KV jointing kit 3x300 sq mm heat shrinkable O/D |
| 20 | M.S. Angle Iron 65x65x6mm, 4300mm long Bracing with Four Clamp |
| 21 | G.I. Pipe 6 inch dia |
| 22 | E Bracket with bolts & nuts |
| 23 | PG Clamps |
| 24 | MS Gaurding Angle 65x65x6 sqmm |
| 25 | Eye bolt with nut |
| 26 | GI Barbed wire |
| 27 | Number Plate with Clamp Nut & Bolt |
| 28 | Danger Board with clamp Nut & Bolt |
| 29 | M.S. Bolts, Nuts & Washers |
| 30 | Stone Pad (300x300x75) |
| 31 | Aluminum Paint |
| 32 | Red Oxide Paint |
| 33 | Earth Wire Clamp with Nut & Bolts |
| 34 | M.S Top Channel 125x65x3200 mm |
| 35 | M.S Dropper Channel |
| 36 | Holding Clamps for Top & Dropper |
| 37 | 33 KV F-Bracket |
| 38 | Cross Arm Holding Clamps |
| 39 | Aluminum Binding Wire |
| 40 | Holding Clamps for GI Pipe |
| 41 | Holding Clamps for Cable Primary S/S side |
| 42 | Holding Clamps for Guarding Angle |
| 43 | Guay Insulator |
| 44 | Cable Route Marker |
| 45 | Cable suport Structure |
| 46 | Fabrication,Erection,Fixing,Laying,saging,completion, testing and commissing of 33kv line Works.(As Per RESPO Norms & Drw.) :- exp. pit digging and erection, Grouting of s/s structur & building of plinth.tensinoning of conductor,fitting of armour rods and binding of conductors. Jointing, cable termination and connections etc. |
| 47 | Double Pole structure 11 Mtr Long SP-55 Excvation Fabrication,Erection,Fixing all clamps and other accessories such as No plate danger board barbed wire ,painting etc with earting of supports |
| 48 | Single support ST Pole 13 Mtr Long SP-72 Excvation and put the stone pad in to the pit and Fabrication,Erection,Fixing all clamps and other acccessories such as No plate danger board barbed wire ,painting etc with earting of supports |
| 49 | Double Pole structure 13 Mtr Long SP-72 Excvation Fabrication,Erection,Fixing all clamps and other accessories such as No plate danger board barbed wire ,painting etc with earting of supports |
| 50 | Four/Tri Pole structure 13 Mtr Long SP-72 Excvation Fabrication,Erection,Fixing all clamps and other accessories such as No plate danger board barbed wire, painting etc with earting of supports |
| 51 | Laying of HDPE Pipe Underground minimum 3 Mtr. Below by HDD Method along with laying of 33 KV 3x300 sqmm. XLPE cable in HDPE pipe (200 mm DIA) (pipe to be laid by HDD method) |
| 52 | Laying,saging & Stringing of ACSR Dog conductor with fitting all accessories including Sundry items |
| 53 | Fixing ,prepare and Making 33 KV outddoor of 3x300 Sq. mm XLPE Cable Jointing Kit |
| 54 | Fitting Complete Stays (GI Stay rod 20x1800, Stay wire 7/8 SWG 10 kg, Stay Clamp, Bolt, Nut and washer with Concret Guay Insulator) |
| 55 | Hosting of 33kv 3x300sqmm XLPE cable on double pole/Tri Pole including G.I. Pipe 6 inch dia M long including its jumpring complet with Sundry Items |
| 56 | Guarding below 33kv line for composite 11kv line with Earth wire clamps and accessories |
| 57 | Grouting of 11/13 Mtr. S.T.P. Pole & 9 Mtr. PCC per pole with concreted with1:4:8 cement concrete mmixture.(make foundation 450x450mm plinth will be 300mm above the ground level)as per drawing respo. Norms |
| 58 | Grouting of stay with cement, coarse sand & brick ballast of block length of rod in the cc 1:4:8 etc. |
| 59 | Choping of branches of Tree along the route of the line and disposal of the same, after obtaining permission of competent authority |
| 60 | fixing the Cable Route Marker in to the ground where the under ground cable work done. |
| 61 | Assembling and installation of Bus Isolator/ Line Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes complete with earthing and line connections & fabrication for proper fixing if required. |
| 62 | Painting of the all STP 11/13 Mtr. Long in 33 KV/11 KV line V-type Coross arm clamps with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. |
| 63 | Earthing of 11 Mtr./13 Mtr. Long STP poles complete as per construction manual and drawings with G.I. Wire fitted in Earth wire clamps M.S. Nut Bolt & Washer. |
| 64 | CONSTRUCTION OF CONTROL CABLE TRENCH WITH TRENCH COVER IN SWITCHYARD, AS PER Specifation (All required matrials provided/Supply by the contractor own his cost):- |
| 65 | Applying of All type NOCs like documentation/NOCs from Railway Crossing/ Electricity Safety/NHAI/Strate Highway Crossing/Forest/Irrigation etc. with the depositing of Processing Fees upto approval and energistion work of the line after all required approvels. Total in Figures 0.0 23 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |