| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, ESWC, Aligarh. Name of Work: Increasing capacity of 33/11kv Sub-stations Atrauli New, Aligarh 2x8 To 1X8+1X10 MVA Under Business Plan 2026-27 (Semi Turn Key Basis) Turn Key E-Tender No: ESWCA-05/2026-27 |
| 2 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Work Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rates Quoted Per Unit with GST & All Taxes Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT With GST & All Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 3 | Safe carriage, loading, unloading, dragging & stacking of following material from store center to contractors dump site to pit site as per requirement. |
| 4 | 33 KV Single Transformer Control Panel. |
| 5 | 33 KV VCB 800A, 750 MVA |
| 6 | 33 KV CT, 400/100/1-1-1A |
| 7 | 33 KV Fuse Set |
| 8 | 11 KV 3 Core XLPE Cable Al. 3x300 Sq.mm |
| 9 | 11 KV Cable Jointing kit. Heat 3x300 Sq. mm Indoor |
| 10 | 11 KV Cable Jointing kit. Heat 3x300 Sq. mm Outdoor |
| 11 | Supply & providing of following Material & including Miscellaneous line items requried of line makeing (Electrical Work As Per RESPO Norms & Drawing. ) :- |
| 12 | Structure for 33 KV CT |
| 13 | Structure for 33 KV Fuse Set |
| 14 | M.S. Nut Bolt off size with washer |
| 15 | Control Cable 4x2.5 Sq. mm.Cu. Xlpe (Armoured) |
| 16 | Control Cable 2x2.5 Sq. mm.Cu. Xlpe (Armoured) |
| 17 | Painting of Substation Structure |
| 18 | Structure For cable support of power T/F |
| 19 | \\"L\\" Type Structure for Neutral |
| 20 | Bettery Charger |
| 21 | Erection of following Material & Miscellaneous Electrical Works. (As Per Resspo Norms) :- |
| 22 | Plinth & Foundation of 33KV CT (1 No), 33 KV Fuse Set (1 No) as per Resspo Noms. |
| 23 | Fuse Set/C.T/ STRUCTURES (1+1): Fabrication of structure, including cutting, straightening & drilling of holes in Channel/Angle/Joists. M.S.Plate to be fixed on structure of required size. |
| 24 | Plinth for 33 KV V.C.B. |
| 25 | Construction of plinth for the structure of 33 KV VCB & C.T.’s as per details for . (All required materials provided / Supply by the contractor own his cost) :-Excavation of earth of size 2x(2.0x2.0x1.0)m pits for construction of plinth. |
| 26 | Brick Ballast ratio (1:4:8) (cement, sand & brick ballast) for foundation work 2x(2.0x2.0x0.5)m plinth. |
| 27 | R.C.C. work in ratio 1:2:4 (cement, coarse sand & stone grit) of 20m size for making plinth of size 2x(2.0x2.0x1.0)m and grouting of foundation bolts 04 Nos. for 33 KV VCB. |
| 28 | 12mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side |
| 29 | Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 3mm into the ground at 30 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the G.I.Earth strip size 50x6mm will be welded to the G.I. pipe and neutral earthing support & other installed equipment in switchyard. All required material provided / supply by the contractor own his cost. |
| 30 | CONSTRUCTION OF CONTROL CABLE TRENCH WITH TRENCH COVER IN SWITCHYARD, AS PER Specifation (All required matrials provided/Supply by the contractor own his cost):- |
| 31 | Installation of 5/8/10 MVA Transformer and other accessories equipments. |
| 32 | Fabrication and erection of neutral earthing L Type support made of G.I. Channel size 100x50mm. Structure shall be 4 Mtr. Long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer. |
| 33 | Fabrication and erection of cable support made of two pieces of G.I. Angle (65x65x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. G.I. Flat (50x6) mm pieces of size 750 mm long each by welding at equal intervals and grouting in a block of size (300x300x700)mm in C.C. 1:3:6 (cement, coarse sand and stone ballast) complete and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts. |
| 34 | Refixing of properly Control Cable connections for OTI, WTI, PRV,33 KV Breaker, 33KV CT, 33KV PT, Single/Double Control & Relay pannel Buck holz relay. |
| 35 | H.T. Power Cable Laying (11 KV 3X300sqmm): Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends. |
| 36 | Preparation of 11 KV Power Cable Jointing Kits: Making of 11 KV XLPE Heat shrinkable Indoor/outdoor jointing kits 3x185Sq.mm/3x300Sq.mm/3x70Sq.mm after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs |
| 37 | Installation of 24V Battery and Battery Charger: Assembling and installation of the cabinet of Battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect. |
| 38 | Laying of Control Cables (2x2.5)mm2/ (4x2.5)mm : Laying of different size of (2x2.5)mm2/ (4x2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT’s to CT’s Junction Box, 33 KV CT, 33 KV PT, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment. |
| 39 | Painting of Structures : Painting of the all structures with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect. |
| 40 | Installation of 33 KV Fuse Set: Assembling and installation of fuse set on the fuse set structure. The work includes complete with earthing and line connections & fabrication for proper fixing, if required. |
| 41 | Installation of 33 KV VCB : Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes complete with earthing and line connections & fabrication of addition arrangement for proper fixing, if required. |
| 42 | Installation of 33 KV VCB Control Panel for single T/F & Double T/F Control Panel. Carefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. |
| 43 | Installation of 33 KV C.T.’s: Installation of 3 Nos. C.T.’s on the C.T’s structure. The work includes complete with earthing and line connections & fabrication for proper fixing, if required to complete the work. |
| 44 | 33 KV CT’s Junction Box: Providing & fixing of junction box of size (400x400x150) mm made of G.I. sheet of 16 SWG in between 33 KV CT’s & control panel. The work also include making proper connection on the junction box and making all connection in between CT’s and control panel complete as per manufacture’s panel drawing including testing and commissioning of work etc. complete the work. |
| 45 | 33 KV Bus Bar Jumpering: Jumpering, including clamping/binding with ACSR Dog conductor/33KV 3x300mm2 XLPE cable with providing P.G.Clamp & Connector HV side of T/F and other accessories with complet Job. |
| 46 | Removal of existing 05 MVA/8 MVA Transformer and other accessories equipments. |
| 47 | Disconnecting HT cable connection from 33KV side & 11KV side of 5 MVA Power transformers & Removing of Protection Connections for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc. |
| 48 | Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth. |
| 49 | Disconnecting Earthing strip from body of 5 MVA/8 MVA Power transformer. |
| 50 | Safe Shifting of 5 MVA/8 MVA Power transformer from existing plinth to safe place in the 33/11 KV substation switchyard. |
| 51 | Dismantling VCB & CT work of old Damaged VCB & CT with Structure in switchyard |
| 52 | Reparing of Power T/F Plinth including |
| 53 | 12mm.thick Cement Plaster in ratio 1:4, Cement coarse & Sand on all side of plinth. |
| 54 | Neat cement coating thick on top surface of plinth. |
| 55 | R.C.C. work in ratio 1:2:4 (cement, coarse sand & stone grit) on Power T/F Plinth including 3 inch thiknes of R.C.C. |
| 56 | Cleaning & Removing of oily & Damaged sarface of plinth approx Total in Figures 0.0 23 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |