| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. DSR 2023- 2.8.1 |
| 2 | Cartage of surplus earth/malva up to 5 Km distance including loading and unloading. - SOR-231(a) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023- 4.1.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023- 4.1.3 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 4.1.2 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :, Foundations, footings, bases for columns. DSR 2023- 4.3.1 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 2023- 6.1.1 |
| 8 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand) DSR 2023- 13.4.1 |
| 9 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor graded on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. for grading I material (GSB-1) (Sanction rate) |
| 10 | trimixing of CC Surface with hardner 3.50 kg/sqm including proper completion of work |
| 11 | Supply and laying of black polytheine sheet as per direction of enggineer in charge etc. all complete S/R |
| 12 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re- olling the sub grade and disposal of surplus earthwith lead upto 50 metres. DSR 2023- 16.1 |
| 13 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. DSR 2023- 15.3 Please Enable Macros to View BoQ information |