|
| 1 | Carriage of followings from ESC. BSR to pit site on kachcha pakaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work. Distance about to 60 Km. |
| 2 | PCC Pole 8.5 mtr. Long from E.S.C. Bulandshahr to site. |
| 3 | PCC Pole 11 mtr. Long from E.S.C. Bulandshahr to site. |
| 4 | 25 63, 100 KVA T/F from E.S.C. Bulandshahr to site. |
| 5 | Carriage of All line Material from store to Je Store Sub-Station as ACSR Weasel conductor ABC condutor GI wire, Earth wire, M.S Chanel, Angle, Stay & Earthing Rods, Barbed wire Disc Insulator etc. |
| 6 | Erection of 8.5 mtr. Long Single Support including complete 1 LT Fittings as per RESPO Manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 7 | Erection of 11 mtr. Long Single Support including complete 1 LT Fittings as per RESPO Manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Erection & Grouting of Double pole including complete HT Fittings as per RESPO Manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Grouting of Single support shall be grouted with cement, sand and brick ballast/stone ballast including the cost of cement, sand, brick ballast/stone ballast etc. required for proper completion of work. |
| 10 | Laying, sagging, Stringing, binding and jumpering of ACSR Weasel conductor on the newly erected pole requried for proper completion of work. |
| 11 | Mounting & Installation of 25, 63, 100 kva T/F on D/Pole. |
| 12 | Fixing of stay rod with stay wire in proper way with Nozelling. |
| 13 | Grouting of Stay rods. |
| 14 | Gaurding of 11 KV line at road crossing by laying 3 Nos. GI wire of size 6/10 SWG parallel and fixing of lacings (Tilli) at a distance at 1.5 mtr as per direction of supervising engineer/RESPO mannual it. Includes the cost of labour, T&P carrier etc required lor proper completing of work. |
| 15 | Resagging of loose and bad sag of 33 kv line. |
| 16 | Resagging of loose and bad sag of L.T./11 kv line. |
| 17 | Repairing of old Guarding 11 kv line at road crossings |
| 18 | Dismentalling of damaged/broken Pcc pole |
| 19 | Chopping of Tree branches. |
| 20 | Tightening of Stay |
| 21 | Change of broken/Damaged/Missing following Items. |
| 22 | Pin Insulator |
| 23 | Disc Insulator |
| 24 | Nut & Bolt off size |
| 25 | Bended X-Arm/Angle/Channel |
| 26 | Alignment of PCC/STP Pole |
| 27 | D.P. Clamp |
| 28 | Making of plinth of the damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the pole |
| 29 | The following material is required to be supplied by the contractor |
| 30 | F Clamp |
| 31 | LT Clamp |
| 32 | LT Insulator |
| 33 | Double pole clamp. |
| 34 | Holding Clamp |
| 35 | Nut & Bolt off size |
| 36 | X Arm Clamp |
| 37 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |