Tender For Shifting And Reconstruction Of Existing Electrical Installation Due To Impvt Such As Widening And Strengthening To Chhatia Kalakala Road From 0.00 Km To 16.393 Km In The District Of Jajpur For The Year 2026-27
Tender Overview
Project Description
Tender for Shifting And Reconstruction Of Existing Electrical Installation Due To Impvt Such As Widening And Strengthening To Chhatia Kalakala Road From 0.00 Km To 16.393 Km In The District Of Jajpur For The Year 2026-27
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-May-2026 | Modification in Office Memorandum regarding APS calculation in DTCN. | Other | 30-May-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | PART A: Construction of 0.05 CKM 33 KV O/H line using 13 Mtr. WPB Pole & 148 Sq.mm. AAA Conductor 33 KV Cut Point with 180 Degree AngleWPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=395.72 KG+10.74 KG= 406.46 KG) |
| 2 | Straight Cross Arm Channel(GI) 100 x 50 x 6 mm, 9.56 KG/mtr, each Channel(GI) length 1.7 Mtr., 2 No's of Channel(GI) = (2x 9.56x1.7) |
| 3 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 4 | Straight Cross Arm Top Channel(GI) 100 x 50 x 6 mm, 9.56 KG/mtr, each Channel(GI) length 0.306 Mtr., 2 No's of Channel(GI) = (2x 9.56x0.306) |
| 5 | Danger Plate, 1 no's. |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 9 | 33KV pin insulator polymer |
| 10 | H W fitting(B&S)90KN,4 Bolt |
| 11 | Disc insulator (B&S)90 KN polymer |
| 12 | Earthing of Support ( Coil Type ) |
| 13 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 14 | Wedge connector for 148 sq.mm AAA conductor |
| 15 | GI Nut , Bolt & Washer of different sizes (4.879 Kg each 180 deg. Cut point) |
| 16 | POLYCARBONATE BIRD GUARD |
| 17 | Black Paint(GIS Numbering & Zebra Stripping) |
| 18 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 19 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX2200mm) = 0.55Cu.mtr(Per Pole) |
| 20 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 21 | 33 KV Pin Points148 sq.mm AAA conductor |
| 22 | PART B: Construction of 1.0 CKM 11 kV O/H line using 11 Mtr. WPB Pole & 80 Sq.mm. AAA Conductor11 KV Cut Point with 90 Degree AngleWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 23 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 24 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 25 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 26 | Danger Plate, 1 no's. |
| 27 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 28 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 29 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 30 | 11 KV pin insulator polymer |
| 31 | H W fitting(B&S) 70KN, 3Bolt |
| 32 | Disc insulator (B&S) 70 KN polymer |
| 33 | Earthing of Support ( Coil Type ) |
| 34 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 35 | WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR |
| 36 | POLYCARBONATE BIRD GUARD |
| 37 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 38 | H.T. Stay set (Complete ) |
| 39 | H.T. Stay Insulator Type-C |
| 40 | 7/10 SWG Stay Wire 15kg /stay |
| 41 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 42 | Black Paint(GIS Numbering & Zebra Stripping) |
| 43 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 44 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 45 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 46 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 47 | 11 KV Pin Points With WPBWPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 48 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 49 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 50 | Danger Plate, 1 no's. for each pole |
| 51 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 52 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 53 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 54 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 55 | Earthing of Support ( Coil Type ) |
| 56 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 57 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 58 | 80 sq.mm AAA conductor |
| 59 | Crimping type Midspan Compression Joint for 80 sq.mm AAA conductor |
| 60 | Black Paint(GIS Numbering & Zebra Stripping) |
| 61 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 62 | POLYCARBONATE BIRD GUARD |
| 63 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 64 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 65 | Part-C: Installation of 01 No of existing 11/0.433 KV, 63 KVA DTR on Proposed DP (Cost of DTR not considered, existing DTR will be used)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 66 | 9 Mtr. long 300 Kg. PSC Pole |
| 67 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 68 | EYE hook for XLPE Aerial bunched Cable |
| 69 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 70 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 71 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 72 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 73 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 74 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 75 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 76 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 77 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 78 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 79 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 80 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 81 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 82 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 83 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 84 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 85 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S |
| 86 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 87 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. |
| 88 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - From LTDB to Pole |
| 89 | AB Switch(11KV,200A.3pole,50Hz) |
| 90 | D.O.Fuse( 11KV.200A.3Pole) |
| 91 | 5Amp Fuse link |
| 92 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 93 | POLYCARBONATE BIRD GUARD |
| 94 | Disc insulator (B&S)70 KN polymer |
| 95 | H W fitting (B&S)70KN(3bolted) |
| 96 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 97 | 11KV pin insulator polymer |
| 98 | HT stay set complete |
| 99 | HT stay Clamp (1.9Kg/pair) |
| 100 | HT stay insulator TYPE-C |
| 101 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 102 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 103 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 104 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 105 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 106 | Danger plate 11kv |
| 107 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 108 | Name plate |
| 109 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 110 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 111 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 112 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 113 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 114 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 115 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 116 | Laying of 4 Cx 95 mm2 LT XLPE Cable |
| 117 | SITC and Erection of GI Fencing with Gate |
| 118 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 119 | Supply of AL Lugs suitable for 95 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 120 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 121 | Part-D: Installation of 01 No of existing 11/0.433 KV, 100 KVA DTR on Proposed DP(Cost of DTR not considered, existing DTR will be used)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 122 | 9 Mtr. long 300 Kg. PSC Pole |
| 123 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 124 | EYE hook for XLPE Aerial bunched Cable |
| 125 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 126 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 127 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 128 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 129 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 130 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 131 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 132 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 133 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 134 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 135 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 136 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 137 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 138 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 139 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 140 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 141 | LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S |
| 142 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 143 | 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. |
| 144 | 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole |
| 145 | AB Switch(11KV,200A.3pole,50Hz) |
| 146 | D.O.Fuse( 11KV.200A.3Pole) |
| 147 | 10Amp Fuse link |
| 148 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 149 | POLYCARBONATE BIRD GUARD |
| 150 | Disc insulator (B&S)70 KN polymer |
| 151 | H W fitting (B&S)70KN(3bolted) |
| 152 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 153 | 11KV pin insulator polymer |
| 154 | HT stay set complete |
| 155 | HT stay Clamp (1.9Kg/pair) |
| 156 | HT stay insulator TYPE-C |
| 157 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 158 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 159 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 160 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 161 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 162 | Danger plate 11kv |
| 163 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 164 | Name plate |
| 165 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 166 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 167 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 168 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 169 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 170 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 171 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 172 | Laying of 4 Cx 150 mm2 LT XLPE Cable |
| 173 | SITC and Erection of GI Fencing with Gate |
| 174 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 175 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 176 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 177 | PART E: Installation of 01 Nos of 33 kV Road crossing guarding having span 40 Mtr. each Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.5 mtr., 4 no's Channel(GI) required =( 4x7.14x2.5) ( For Single Pole) |
| 178 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 179 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 180 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 181 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 182 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.7 mtr For raising)= 12.7x2.36 |
| 183 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 184 | Part:F:- 1. Installation of 4 Nos of 11 kV Road crossing guarding having span 30 Mtr. each 2. Installation of 1 Nos of LT Road crossing guarding having span 30 Mtr. each Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole) |
| 185 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 186 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 187 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 188 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 189 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 190 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 191 | PART G: Construction of 0.3 KM LT line using 9 Mtr. PSC pole & (4C×70 mm² (P)+1C×70 mm²(M)+1CX16 mm²(Street Light) LT AB cable WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 192 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 193 | H.T. Stay set (Complete ) |
| 194 | H.T. Stay Insulator Type-C |
| 195 | 7/10 SWG Stay Wire 15kg /stay |
| 196 | 9 Mtr. long 300 Kg. PSC Pole |
| 197 | LT Stay set Complete |
| 198 | 7/12 SWG GI stay wire, Grade -2 |
| 199 | LT stay Clamp ( 1.40Kg/pair) |
| 200 | LT Stay insulator |
| 201 | LT Accessories with Eye hook and ClampPole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 202 | EYE hook for XLPE Aerial bunched Cable |
| 203 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 204 | Suspension Clamp with EYE hook for ABC |
| 205 | 4C×70 mm² (P)+1C×70 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 206 | 8 WAY SERVICE Distb.Box with kit kat fuse and Aluminium bus bar. |
| 207 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 208 | GI Pipe Earthing (each 5th pole to earth) |
| 209 | Coil Earthing |
| 210 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 211 | Danger plate (LT) |
| 212 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 213 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 214 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 215 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 216 | Black Paint(GIS Numbering & Zebra Stripping) |
| 217 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 218 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 219 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 220 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 221 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 222 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 223 | PART H: Construction of 0.5KM LT line using 9 Mtr. PSC pole & (4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) LT AB cable (9 Mtr. long 300 Kg. PSC Pole |
| 224 | LT Stay set Complete |
| 225 | 7/12 SWG GI stay wire, Grade -2 |
| 226 | LT stay Clamp ( 1.40Kg/pair) |
| 227 | LT Stay insulator |
| 228 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 229 | EYE hook for XLPE Aerial bunched Cable |
| 230 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 231 | Suspension Clamp with EYE hook for ABC |
| 232 | 4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 233 | 8 WAY SERVICE Distb.Box with kit kat fuse and Aluminium bus bar. |
| 234 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 235 | GI Pipe Earthing (each 5th pole to earth) |
| 236 | Coil Earthing |
| 237 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 238 | Danger plate (LT) |
| 239 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 240 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 241 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 242 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 243 | Black Paint(GIS Numbering & Zebra Stripping) |
| 244 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 245 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 246 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 247 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 248 | PART I : Dismantling Portion Dismantling of 09/11 Mtr. Joist/WPB Pole- 116X100mm |
| 249 | Dismantling of 9/8 Mtr. PCC/Joist Pole |
| 250 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 63KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 251 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer below 100KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 252 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line |
| 253 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line |
| 254 | Dismantling of ACSR/AAAC 148/232mm2 from overhead line |
| 255 | Dismantling of varous size of LT AB Cable Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender