| 1 | Carriage of Following material from elec. Store centre unnao to different work dump site along with loading , unloading and proper stocking distance as per indent. |
| 2 | PCC Pole 8.5 mtr long |
| 3 | PCC Pole 11 mtr long |
| 4 | STP Pole 9 mtr long |
| 5 | STP Pole 11 mtr long |
| 6 | ACSR Weasal Conductor |
| 7 | ACSR Rabbit Conductor |
| 8 | ACSR Dog conductor |
| 9 | M.S. T-off Channel |
| 10 | 11 KV Polymer Disc Insulator with fittings (T&C) |
| 11 | 11 KV Polymer Pin Insulator |
| 12 | 11 KV V-TYPE X-ARM |
| 13 | Top Channel |
| 14 | Dropper Channel |
| 15 | M.S. Sub Station Angle |
| 16 | 11 KV XLPE Cable AL. 3X70 sq mm |
| 17 | 11 KV XLPE Cable AL. 3X120 sq mm |
| 18 | 11 KV XLPE Cable AL. 3X185 sq mm |
| 19 | 11 KV XLPE Cable AL. 3X300 sq mm |
| 20 | 11 KV 3X70 sqmm I/D & (O/D) C/J Kit |
| 21 | 11 KV 3X120 sqmm I/D & (O/D) C/J Kit |
| 22 | 11 KV 3X185 sqmm (I/D) & O/D C/J Kit |
| 23 | 11 KV 3X300 sqmm I/D & (O/D) C/J Kit |
| 24 | 11 KV 3X70 SQ.MM. JOINTING KIT STRAIGH THROUGH |
| 25 | 11 KV 3X70 SQ.MM. JOINTING KIT STRAIGH THROUGH |
| 26 | 11 KV 3X70 SQ.MM. JOINTING KIT STRAIGH THROUGH |
| 27 | L.T. Cable 1-Ph. ABC ( 1x16+1x25) sqmm |
| 28 | L.T. Cable 3-Ph ABC(3X50+1X35+1X16)sqmm |
| 29 | L.T. Cable 3-Ph ABC(3X95+1X70+1X16)sqmm |
| 30 | L.T. Cable 3-Ph ABC(3X120+1X95+1X16)sqmm |
| 31 | 2*4 SQ.MM Armoured cable PVC |
| 32 | 2*6 SQ.MM Armoured cable PVC |
| 33 | 11 Kv Pilfer Proff Metering Cubical |
| 34 | 11 Kv outdoor CT/PT Unit |
| 35 | M.S. Earthing Rod (2500x20 MM) |
| 36 | GI wire 3.15 MM 10 SWG |
| 37 | Stay Set GI 16x1800 MM Sq. |
| 38 | Stay wire (3.15 MM) 7/10 SWG (GSS wire) |
| 39 | Transformer 25 KVA 11/0.4 KV |
| 40 | Transformer 63 KVA 11/0.4 KV |
| 41 | Transformer 100 KVA 11/0.4 KV |
| 42 | Supply and Fixing of Following materials |
| 43 | Stone Pad 300x300x75mm |
| 44 | LT Shackle Insulator |
| 45 | LT Clamp with Nut & Bolts |
| 46 | Cross arm holding clamp |
| 47 | Holding Clamp for PCC/STP Pole with Nut & Bolt |
| 48 | Earth wire clamp with Nut & Bolt |
| 49 | Stay clamp with Nut & Bolt |
| 50 | F-Clamp for Top Insulator with N&B |
| 51 | Cross Bracing Angle |
| 52 | Alluminium PVC Cable 1X25 sq.mm. |
| 53 | Alluminium PVC Cable 1X50 sq.mm. |
| 54 | Long Barel Alluminium Lugs Crimping Type 95/120 sqmm.(for 25/63/100 KVA TF) |
| 55 | 11 KV Fuse Set |
| 56 | Suspension clamp |
| 57 | Dead end clamp |
| 58 | Eye hook |
| 59 | Danger Board with clamp |
| 60 | Barbed wire GI |
| 61 | Alluminium Paint |
| 62 | Paint for pcc/stp pole |
| 63 | PG Clamp |
| 64 | Stay Insulator |
| 65 | G.I. pipe 6\\" Dia |
| 66 | HDPE Pipe 120 MM |
| 67 | LT Fuse set Protection unit with SMC Box for 25 KVA Transformer |
| 68 | LT Fuse set Protection unit with SMC Box for 63 KVA Transformer |
| 69 | LT Fuse set Protection unit with SMC Box for 100 KVA Transformer |
| 70 | Gaurding angle |
| 71 | Erection of 8.5m/9m/11m PCC/STP Single Pole (HT/LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 72 | Erection of 8.5m/9m/11m PCC/STP Double Pole (11 KV Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 73 | Fabrication/ Modifications of MS Items as per requirement of site conditions. |
| 74 | Making T-off arrangement including fabrication & fitting of accessories. |
| 75 | Earthing Complete With Material(by MS earthing rod of 20x2500 mm and 6 SWG earthing wire etc.) of PCC/STP poles as per RESPO norms |
| 76 | Grouting of Pole as per RESPO Norms with grouting materials. |
| 77 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 78 | New Earthing for Distribution transformers one neutral and one for body of transformer 40 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 35x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding. |
| 79 | Mounting of cable box Indore/Outdoor 3x70/3X120/3x185/3x300 sq mm |
| 80 | Mounting of cable Jointing kit straight through 3x70/3x120/ 3X3185 sq mm |
| 81 | Digging of cable trench in one meter deep in:(a) Normal Soil /Kharanja Road/Metallic Road after laying duble circuit HT XLPE cable 3x185/3x300 sq mm work complet Pit back filling brick and balaste remaining pack cable trunch as per RESPO norms etc./laying ,stringing and sagging of 11 kv xlpe single circuit cable with support. |
| 82 | Metering Cubical pilfer Installation |
| 83 | 11 Kv outdoor CT/PT Unit installation |
| 84 | Laying of 11 kv xlpe Double circuit Cable 3x70/3x120/3x185/3x300 sq mm with Drill Machine With the help of HDPE Pipe (HDD method ) |
| 85 | Striging and sagging of 2 wire of 10 No SWG GI wire for guarding and making lacing at one meter or a part in all the span between all supports. |
| 86 | Laying stringing and sagging of O/H Three Phase 33 KV Line by ACSR Weasel Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 87 | Laying stringing and sagging of O/H Three Phase 33 KV Line by ACSR Dog Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 88 | Laying stringing and sagging of O/H Three Phase 11 KV Line by ACSR Rabbit Conductor including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 89 | Laying stringing and sagging of O/H Single Phase LT Line by ABC ( 1x16+1x25)sqmm including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 90 | Laying stringing and sagging of O/H Three Phase LT Line by ABC (3X50+1X35+1X16)sqmm including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 91 | Laying stringing and sagging of O/H Three Phase LT Line by ABC (3X95+1X70+1X16)sqmm including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 92 | Laying stringing and sagging of O/H Three Phase LT Line by ABC (3X120+1X95+1X16) sqmm including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 93 | Laying stringing and sagging of O/H 2*4/2*6 sqmm PVC Armoured cable including all associated work with joint/jumpers and binding of insulator with complete all work as required. |
| 94 | Placement of following 11/0.433 KV Distribution Transformer from dump site to newly constructed T/F on Double Pole and Installation cable termenation and commissioning of 25/63/100 KVA Transformer including drassing damaged cable, lugs ,Jumpering & connecting Earthing of body & neutral as per required. ( required mattrial as lugs, flat copper L plate, nuts & bolts etc for above job shall be provided by contractor) |
| 95 | Dismentalling & Carriage of following receive back materials from site to store centre with in 0-20 km :- |
| 96 | Scrap Iron |
| 97 | Scrap Conductor/cable |
| 98 | Transformer 10/25/63/100 KVA/ 11/0.4 KV |
| 99 | Receive back Metering cubical pilfer old & used/damaged |
| 100 | Receive back old & used CT/PT Double pole unit Please Enable Macros to View BoQ information |