|
| 1 | Carriage of following materials from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking distance as per indent. |
| 2 | PCC Pole 11 Mtr. /STP Pole 13 Mtr. |
| 3 | PCC Pole 8.5 Mtr. /STP Pole 11 Mtr. |
| 4 | Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, x-arm, etc. |
| 5 | ACSR Weasel/Rabbit/Dog Conductor |
| 6 | Three Phase/Single Phase A.B. Cable of diff. size for LT Line |
| 7 | LT PVC Cable of diff. sizes |
| 8 | 33 KV / 11 KV XLPE Cable of diff. size |
| 9 | 33 KV / 11 KV Pilfer proof metering cubical of diff. size |
| 10 | 33 KV / 11 KV CT/PT Unit of diff. size |
| 11 | 33 KV / 11 KV I/D & O/D & S/Th Cable Jointing kit according to XLPE Cable |
| 12 | Carriage of following T/F from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking distance as per indent. |
| 13 | T/F 25 KVA / 63 KVA / 100 KVA |
| 14 | Dismantling of existing old 33 KV / 11 KV / L.T. line including rolling back its conductor/G.I. wire from work site to dump site due to shifting or replacement of damaged line. |
| 15 | Dismantling of existing old single pole/ Double Pole and X-arms, brackets, Insulators, Channels and all hardware fittings due to shifting or replacement of damaged line. |
| 16 | Opening of H.V./L.V. connections on existing Distribution Transformer and Dismantling of Transformer by hydra from existing Pole / Double Pole with Safe Carriage along with loading unloading and propoer stocking due to shifting / Increasing Capacity of DT |
| 17 | Fabrication/Modification of MS Items/Nuts & Bolts as requirement of site condition |
| 18 | Erection of PCC 11 Mtr./STP 13 Mtr. double pole (33 KV / 11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 19 | Supply & Fixing of following materials for above job- |
| 20 | Clamp for Top and Dropper channel with N&B for PCC 11 Mtr./STP 13 Mtr. |
| 21 | PG Clamps for PCC 11 Mtr./STP 13 Mtr. |
| 22 | Danger Board with Clamp & Nut & Bolt |
| 23 | Erection of PCC 8.5 Mtr./ST 11 Mtr double pole (33 KV / 11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 24 | Supply & Fixing of following materials for above job- |
| 25 | Clamp for Top and Dropper channel with N&B for PCC 8.5 Mtr./ST 11 Mtr. |
| 26 | PG Clamps for PCC 8.5 Mtr./ST 11 Mtr. |
| 27 | Erection of PCC 11 Mtr./STP 13 Mtr. Single Pole (33 KV / 11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 28 | Supply & Fixing of following materials for above job- |
| 29 | Holding Clamps with N&B for PCC 11 Mtr./STP 13 Mtr. |
| 30 | F-Clamp with N&B for PCC 11 Mtr./STP 13 Mtr. |
| 31 | PG Clamps for PCC 11 Mtr./STP 13 Mtr. |
| 32 | Erection of PCC 8.5 Mtr./ST 11 Mtr Single Pole (33 KV / 11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 33 | Supply & Fixing of following materials for above job- |
| 34 | Holding Clamps with N&B for PCC 8.5 Mtr./ST 11 Mtr. |
| 35 | F-Clamp with N&B for PCC 8.5 Mtr./ST 11 Mtr. |
| 36 | PG Clamps for PCC 8.5 Mtr./ST 11 Mtr. |
| 37 | Erection of PCC/ST Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 38 | Supply & Fixing of following materials for above job- |
| 39 | Suspension Clamp for ABC |
| 40 | Dead End Clamp for ABC |
| 41 | L.T. Clamp with Nuts & Bolts |
| 42 | Eye Hook |
| 43 | Piercing Connector |
| 44 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 45 | Supply & Fixing of following materials for above job- |
| 46 | Stay Clamp with N&B |
| 47 | Stay Insulator |
| 48 | Laying stringing and sagging of O/H 33 KV / 11 KV Line Three Phase by Conductor including all associated work with joint/jumpers and binding of insulator as required. |
| 49 | Laying stringing and sagging of O/H Single /Three Phase L.T. Line by ABC of diff. size including all associated work with joint/jumpers and binding of insulator as required. |
| 50 | Making T-off arrangement including fabrication & fitting of accessories. |
| 51 | Grouting of PCC Pole 11 Mtr. /STP Pole 13 Mtr. with muffing as per RESPO Norms with grouting materials. |
| 52 | Grouting of PCC Pole 8.5 Mtr. /STP Pole 11 Mtr. with muffing as per RESPO Norms with grouting materials. |
| 53 | Boring Type Pipe Earthing 40 Feet |
| 54 | Earthing as per RESPO Norms. |
| 55 | Stringing and sagging of 2 wire of 6 SWG GI wire for guarding and making lacing at one meter part in all span between all support including carriage from dump site to pit site with complete all work as required. |
| 56 | Supply & Fixing of following materials for above job- |
| 57 | Holding clamp for Guarding Angle with N&B |
| 58 | Fixing of 3-Ph. Distribution Box with clamp, N&B with complete all work as required. (All the required materials as DB Box Clamps, Piercing Connectors, Nut & bolts etc for this job shall be provided by the contractor except Distribution Box) |
| 59 | Supply & Fixing of following materials for above job- |
| 60 | Clamp for Distribution Box with nut & bolt |
| 61 | Piercing Connector |
| 62 | Mounting of following Transformer on double pole including its cartage and dragging from dump site to pit site & installation and commissioning of T/Fs and All the jumpering & connection with the system are included in the scope of work. (All the required materials as 04 nos.-Al. Lugs for each T/F, Nut & bolts for S/S Angle etc for this job shall be provided by contractor except T/Fs) |
| 63 | T/F 25 KVA / 63 KVA / 100 KVA |
| 64 | Laying of LT PVC Cable of diff. size including all associated work. (All the required materials for above job shall be provided by contractor except LT PVC Cable) |
| 65 | Supply & Fixing of 3-Phase Fuse Unit system for Protection at Double Pole |
| 66 | Supply & Fixing of LT Fuse Set Installed in SMC Box at 25 KVA/63KVA/100 KVA T/F (including All. Lugs, Fuse Wire of appropriate rating, Clamps, N&B etc) |
| 67 | Laying of underground 33 KV / 11 KV XLPE Cable of diff. size along with cost of bricks & sand by conventional method as per RESPO Norms. |
| 68 | Laying of underground 33 KV / 11 KV XLPE Cable of diff. size by HDD / Drilling method as per RESPO Norms. |
| 69 | Laying of underground HDPE pipe of diff. size by drill / trench / conventional Method as per requirement of site. (HDPE Pipe and other required material shall be provided by the contractor) |
| 70 | Fixing of cable jointing kit of diff. size |
| 71 | Installation and commissioning of new metering cubical of diff. size with proper commssioning as per RESPO Norms |
| 72 | Installation and commissioning of new CT/PT Unit of diff. size with proper commssioning as per RESPO Norms |
| 73 | 33 KV / 11 KV Cable Hosting including jumpering etc. complete work with help of G.I. Pipe as per RESPO Norms (G.I. Pipe and other required material shall be provided by the contractor) |
| 74 | Cutting of Tree Branches lying in the route of making new 33 KV /11 KV/ LT Line |
| 75 | Received Back of follwinng material from work dump site/dump site to Electricity store center unnao with loading, unloading and proper stocking as per requirement. |
| 76 | Distribution Transformer 25 KVA / 63 KVA / 100 KVA |
| 77 | Iron Scrap |
| 78 | Old & Used/Damaged Cable/Conductor Please Enable Macros to View BoQ information |