| 1 | nSoh; vkink@Hkkjh cjlkr@rst gokvksa ls {kfrxzLr ykbZuksa dh ejEer ,oa iwoZfuekZ.k dk dk;ZA |
| 2 | Safe Loading, Carriage & Unloading of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 0-60 km |
| 3 | Safe Loading, Carriage & Unloading of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 0-60 km |
| 4 | Erection of 11 mtr Single ST Pole with all accessories (Cross arm, pin insulator with pin, F-bracket etc.) as per specification. |
| 5 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 6 | Erection of 8.5 mtr Double PCC Pole structure with all accessories (11 KV Disc with Disc fittings, 11 KV Pin insulator with pin etc.) as per specification. |
| 7 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 8 | Plinth of 11 mtr ST Pole as per specification. |
| 9 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 10 | Strengthening of Earthing PCC/ ST Pole as per specification. |
| 11 | Dismentling of LT Line Conductor |
| 12 | Earthing Complete of 8.5 Mtr PCC Pole as per specification. |
| 13 | Laying sagging and binding of ACSR Weasel Conductor HT 3 Phase 3 Wire on eracted pole |
| 14 | Laying sagging and binding of LT Line 3 Phase 4 Wire Conductor on eracted pole |
| 15 | Laying sagging and binding of LT Line 2 Phase 2 Wire Conductor on eracted pole |
| 16 | Laying sagging and binding of oLT Line 1Phase 2 Wire Conductor on eracted pole |
| 17 | Work of Strengthening 10/25/63/100 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 18 | Concreting of stay set as per specification |
| 19 | Intallation of Stay set complete as per specification |
| 20 | Til-Tel of Strengthening 8.5 mtr PCC Pole With Material as per specification. |
| 21 | Strengthening of Fallen Pole PCC/STP With Material as per specification. |
| 22 | Providing and Installation of V-type X-arm holding clamp with nut bolt |
| 23 | Dismentling of Damaged 11 KV HT/LT Line |
| 24 | Dismentling of 11 KV Line Conductor |
| 25 | Providing and Installation of F bracket on erected PCC/ST Pole |
| 26 | Providing and Installation of LT Clamp |
| 27 | Providing and Installation of Nut & Bolt |
| 28 | DC/RC of consumer service cable |
| 29 | Tree Branch Cutting/chopping along the HT/LT Line route Please Enable Macros to View BoQ information |