| 1 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation |
| 2 | Earthwork excavation in soft disintegrated rock laterite soft rock or kankar not requring blasting, etc, complete |
| 3 | Earthwork excavation in medium rock and dense medium rock requiring blasting. |
| 4 | Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete |
| 5 | PCC 1:3:6, with 40 mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. |
| 6 | PCC 1:2:4 using 20mm metal without formwork for structure and equipement plinth including cost of all materials lead, lift, etc. Complete. |
| 7 | RCC 1:1.5:3, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation) |
| 8 | PCC 1:2:4 using 20mm metal with formwork for wall including cost of all materials lead, lift, etc. Complete. |
| 9 | Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete. |
| 10 | Plastering with cm 1:5, 12mm thick for walls including cost of cement, all materials, curing, labour, lead and lift etc., complete. |
| 11 | Colour washing two coats with Ultima paint over one coat of white cement primer for outside wall including cost of all materials, labour, lead, lift, etc., complete. |
| 12 | Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer. |
| 13 | Removing the excess earth to the nearby bund or low laying area by head load lead 200m instructed by field engineer including all lead, lift, etc., complete. |
| 14 | Applicable GST 18% Please Enable Macros to View BoQ information |