| 1 | E/W embankment cutting or inembankment inordinary soil,excavation to be in the form regular pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm Layers including remming and dressing the surface to required level and slope and also including 1.5M lift and 30 mrt lead . The earth from cutting to be use in making embamkment or to be deposite as spoil banks with in 15.00 km distance as directed by the Engineer incharge.i/c Royallity as S.I. No. 253 |
| 2 | Construction of granular sub base by proiding wel graded material,spreding in uniform layours on prepared surface,mixing by mix in place method and compacting disered density,as per Specification clause 401 |
| 3 | M-150 class Brick work in 1:4 Cement & Coarse sand mortor in fdn. & up to plinth including supply of all materials, labour, T & P etc S.I No.305(a) |
| 4 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, |
| 5 | C.C work in 1:2:4 cement coarse sand and 20 mm stone grit including supply of all materials, labour, T & P etc. SINo 279(a) |
| 6 | 12 mm thick plaster in 1:4 Cement and Coarse sand mortar including supply of all materials, labour, T & P etc. SINo 584 (a) |
| 7 | Providing concrete for reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, R.C.C grade M 20 |
| 8 | Supplying, fitting and placing TMT bar reinforcement (Fe 550) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 9 | Supply & fixing of MS Sign Board i/c painting,letter writing etc. complete. |