| 1 | GSBConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 2 | G-3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Machenical Means |
| 3 | Provinding and laying of Rubble moulded Zig Zag Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 4 | Earth work in excavation in Foundation in ordanary soil Lead up to 30 m and lift up to 1.50 m I/C all complete as per directed by Engineer in charge.SI no. 251 |
| 5 | Sand filling in foundation for stabilization of foundation earth I/C all complete as per directed by Engineer in charge.SI no. 255 |
| 6 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per SI No. 281 |
| 7 | Brick work with class M-150 bricks in sand & cement mortar in proportion of 4:1in foundation and plinth I/c supply of all material ,labour ,T&P etc required for proper completion of work all complete as S.I. No. 305 |
| 8 | Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (PCC 1:2:4) |
| 9 | Plaster with cement mortar (1:4) 15mm thick on brick work in subsructrure as per technical specification clauses 613.4 and 1204 |
| 10 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Substructrue complete as per drawing and Technical Specifications Clauses1002,1005, 1010 and 1202 |
| 11 | Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (RCC 1:2:4) |
| 12 | Supply and fixing of sign boad with of complete or as per directed by engineer charges. Please Enable Macros to View BoQ information |