Tender For Work Complete Rewinding And Repairing Of Power Transformer 500Kva/11Kv/440V 3Phase Sl. No. Prm1210474 Make M And B Switch Gears Ltd. Installed Main Substation For Nadhkurkee Coal Dump, Other Lighting Line At Abocp Mine Under Block-Ii Area., Dhanbad-Jharkhand
TDR : 55524315
Tender Notice
BOQ
8 Days Left
Dhanbad
Jharkhand
Tender For Work Complete Rewinding And Repairing Of Power Transformer 500Kva/11Kv/440V 3Phase Sl. No. Prm1210474 Make M And B Switch Gears Ltd. Installed Main Substation For Nadhkurkee Coal Dump, Other Lighting Line At Abocp Mine Under Block-Ii Area.
Name of Work:- Work Complete rewinding and repairing of power transformer 500KVA/11KV/440V 3Phase Sl. No. PRM1210474 make M and B Switch gears Ltd. Installed main substation for Nadhkurkee Coal dump, other lighting line at ABOCP Mine under Block-II Area..
Sl. No.
Item Description
1
Providing and fitting of new electrolytic copper wire strip of required dimension (including less Scrap value).
2
Re-insulation with TP coveribg for both HT and LT coil.
3
Cost of soldering materials ie.Rupatom with oxygen & DA.
4
Cost of insulating materials ie. 15% of total copper value @360 x850/- X15% =45900/-
5
H.T. brass stud with nut, washer, check nut, rubber bush etc.
6
Providing and fitting of joint box with cover etc.
7
Filtration of transformer oil.
8
Energy charge of heating and backing of core and coil.
9
LT brass stud with nut, washer, check nut.
10
Providing and fitting of cork sheet.
11
Fabrication of cooling tube and welding etc.
12
Labour charges for complete dismantling and assembling of core and coil, soldering, and backing of core and coil etc. (15% of Sl. No. 1,2,3,4 ie. 382000/- X15% = 57300.00)
13
Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.