| 1 | Dismantle work |
| 2 | Dismantling of following equipments of old 33 KV (2x5) MVAR Capacitor Bank at Noida 132kv S/S, without any damage to any equipment,structure and all related work to complete the job satisfactory. |
| 3 | 36 kv NCT |
| 4 | 36 kv Series Reactor |
| 5 | 36 kv capacitor bank with cell unit(2*5 MVAR) |
| 6 | Opening work of Jumpers from 33kv Bus(from 04 line isolator) and Dismantle/cutting of earthing of Capacitor unit. |
| 7 | Carriage work |
| 8 | Safe loading of 10 MVAR capacitor bank,Series reactor,NCT by way of using hydra at 132kv substation sector-45 noida,ETD noida with help of skilled labour and required T&P to complete the work satisfactorily.Safety of capacitor bank will be adhered by contractor itself while loading. |
| 9 | Safe carriage (With packing) of 10 MVAR capacitor cells,NCT,series reactor by way of using private vehicle from 132kv substation sector-45 noida,ETD noida to 220kv substation firozabad,ETD firozabad(approx 250 KM)with help of skilled labour and required T&P to complete the work satisfactorily.Safety of capacitor bank will be adhered by contractor itself while carrying. |
| 10 | Safe carriage (With packing) of 10 MVAR capacitor bank by way of using private vehicle from 132kv substation sector-45 noida,ETD noida to 132kv substation narkhi,ETD firozabad (approx 270 KM)with help of skilled labour and required T&P to complete the work satisfactorily.Safety of capacitor bank will be adhered by contractor itself while carrying. |
| 11 | Safe unloading of 10 MVAR capacitor bank at 220kv substation Firozabad store location/desired place by way of using hydra and help of skilled labour and required T&P to complete the work satisfactorily. safety of capacitor bank will be adhered by contractor itself while unloading. |
| 12 | Safe unloading of 10 MVAR capacitor bank at 132kv substation Narkhi store location/desired place by way of using hydra and help of skilled labour and required T&P to complete the work satisfactorily. Safety of capacitor bank will be adhered by contractor itself while unloading. |
| 13 | Erection |
| 14 | Erection of main and auxiliary structure as per drawing including other associated work to complete the Job satisfactory |
| 15 | Safe erection of following equipments as per drawing including other associated work to complete the job satisfactory with skilled labour and special T&P. |
| 16 | 36kv VCB |
| 17 | 36kv CT and NCT |
| 18 | 36kv Line isolator |
| 19 | 36kv Bus isolator |
| 20 | 36 kv Series Reactor |
| 21 | 36 kv capacitor bank with cell unit(2*5 MVAR) (2 unit) |
| 22 | Stringing work of 33kv Bus bar for Capacitor bank of panther conductor (3*12 mtr + Jumper lenght in Bay) approx 100 mtr long with hoisting of disc insulators and clamping bolted type panther tension fitting including other associated work to complete the job satisfactory. |
| 23 | Laying of control cable of size 2cx2.5 sqmm, 4cx2.5sqmm,6cx2.5 sqmm from various equipment PT, VCB, CT, NCT |
| 24 | Termination of control cable 10/06/04/02cx2.5 sqmm at both end in equipments and Control panel |
| 25 | Complete earthing of 33kv equipments CR panel,PT,VCB,CT,Capacitor cells,reactor,NCT, and all structures with MS Flat 50*6 mm to complete the job satisfactory |
| 26 | Complete jumpering work of capacitor unit to 33kv bus(panther conductor) including cutting laying,fixing, and clamping etc to complete the Job satisfactory. Please Enable Macros to View BoQ information |