| 1 | Part-A (Supply of Material)Suspension Clamp with I Hook | Part-A (Supply of Material)Suspension Clamp with I Hook |
| 2 | I Hook | I Hook |
| 3 | J Hook | J Hook |
| 4 | Dead End Clamp with I Hook | Dead End Clamp with I Hook |
| 5 | Clamp for LT Distribution Box | Clamp for LT Distribution Box |
| 6 | Piercing Connector | Piercing Connector |
| 7 | LT Pole Clamp with Nut & Bolt for PCC Pole | LT Pole Clamp with Nut & Bolt for PCC Pole |
| 8 | Earth Wire Clamp for PCC Pole | Earth Wire Clamp for PCC Pole |
| 9 | PG Clamp | PG Clamp |
| 10 | V Type Cross Arm Clamp for 33 KV | V Type Cross Arm Clamp for 33 KV |
| 11 | F-Bracket for 33 KV | F-Bracket for 33 KV |
| 12 | Alu. Paint | Alu. Paint |
| 13 | Red Oxide Paint | Red Oxide Paint |
| 14 | Top Channel for 33 KV | Top Channel for 33 KV |
| 15 | Holding Clamp | Holding Clamp |
| 16 | Brassing Set | Brassing Set |
| 17 | Clamp for Fixing of Cable and Cable Box | Clamp for Fixing of Cable and Cable Box |
| 18 | Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) | Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) |
| 19 | Carriage of ST Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of ST Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 20 | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. LT Distribution Box (48), Stone Pad (96), Stay Set (13), Earthing Complete (23), V Type Cross Arm for 33 KV (15), Polymer Pin Insulator for 33 KV (51), Dropper Channel (2), Disc fitting for 33 KV (12), Disc Insulator for 33 KV (12), Jointing Kit O/D 3x300 sqmm (2) etc and other line Material as required in Estimate/Package) | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. LT Distribution Box (48), Stone Pad (96), Stay Set (13), Earthing Complete (23), V Type Cross Arm for 33 KV (15), Polymer Pin Insulator for 33 KV (51), Dropper Channel (2), Disc fitting for 33 KV (12), Disc Insulator for 33 KV (12), Jointing Kit O/D 3x300 sqmm (2) etc and other line Material as required in Estimate/Package) |
| 21 | Cartiage of LT ABC Cable 3x50 sqmm (320 Mtr.), LT ABC Cable 3x95 sqmm (2750 Mtr.), LT ABC Cable 3x120 sqmm (440 Mtr.), Alu. Cable 1x16 sqmm (40 Mtr.), 33 KV Cable 3x300 sqmm (100 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Cartiage of LT ABC Cable 3x50 sqmm (320 Mtr.), LT ABC Cable 3x95 sqmm (2750 Mtr.), LT ABC Cable 3x120 sqmm (440 Mtr.), Alu. Cable 1x16 sqmm (40 Mtr.), 33 KV Cable 3x300 sqmm (100 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 22 | Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 23 | Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 24 | Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 25 | Digging & Laying of 33 KV Cable 3x300 sqmm then laying earth and its levelling and rammuring etc. complete work as RESPO norms as per RESPO Norms and direction by superivising Engineer. | Digging & Laying of 33 KV Cable 3x300 sqmm then laying earth and its levelling and rammuring etc. complete work as RESPO norms as per RESPO Norms and direction by superivising Engineer. |
| 26 | Laying of 11 KV XLPE cable 3x300 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer. | Laying of 11 KV XLPE cable 3x300 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer. |
| 27 | Laying of LT ABC cable 3x50 sqmm/3x95/3x120 overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer. | Laying of LT ABC cable 3x50 sqmm/3x95/3x120 overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer. |
| 28 | Laying of Alu. cable 1x16 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer. | Laying of Alu. cable 1x16 sqmm overhead with making loop (at a distance of approx. 4 mtr.) as per RESPO Norms and direction by superivising Engineer. |
| 29 | Filling of 33 KV Cable Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer. | Filling of 33 KV Cable Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer. |
| 30 | Erection and grouting of stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Erection and grouting of stay set as ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 31 | Erection of Earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Erection of Earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 32 | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 33 | Concreting of Support of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 34 | Concreting of Led 1x16 sqmm including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Led 1x16 sqmm including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 35 | Fixing of Dropper channel with clamp as per resop norms and direction by supervising engineer. | Fixing of Dropper channel with clamp as per resop norms and direction by supervising engineer. |
| 36 | Fixing of Top channel for 33 KV as per resop norms and direction by supervising engineer. | Fixing of Top channel for 33 KV as per resop norms and direction by supervising engineer. |
| 37 | Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer. | Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer. |
| 38 | Installation of LT Distribution Box with clamps as per RESPO norms and direction by supervising Engineer. | Installation of LT Distribution Box with clamps as per RESPO norms and direction by supervising Engineer. |
| 39 | Fixing of P.G. Clamps as per RESPO norms | Fixing of P.G. Clamps as per RESPO norms |
| 40 | Fixing of V Type Cross Arm Clamp for 33 KV as per RESPO norms | Fixing of V Type Cross Arm Clamp for 33 KV as per RESPO norms |
| 41 | Fixing of Polymer Pin Insulator for 33 KV as per RESPO norms | Fixing of Polymer Pin Insulator for 33 KV as per RESPO norms |
| 42 | Fixing of Suspension clamp with I hook as per RESPO norms | Fixing of Suspension clamp with I hook as per RESPO norms |
| 43 | Fixing of I hook as per RESPO norms | Fixing of I hook as per RESPO norms |
| 44 | Fixing of J hook as per RESPO norms | Fixing of J hook as per RESPO norms |
| 45 | Fixing of Clamp for cable Box | Fixing of Clamp for cable Box |
| 46 | Fixing of Disc Fitting for 33 KV | Fixing of Disc Fitting for 33 KV |
| 47 | Fixing of Brassing Set | Fixing of Brassing Set |
| 48 | Fixing of Piercing Connector as per RESPO norms | Fixing of Piercing Connector as per RESPO norms |
| 49 | Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer. | Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer. |
| 50 | Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer. | Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer. |
| 51 | Removal of old & Used LT Cable 3x50 sqmm/1x16 sqmm and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.). | Removal of old & Used LT Cable 3x50 sqmm/1x16 sqmm and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.). |
| 52 | Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.). | Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.). |