|
| 1 | ENGAGEMENT OF ONE (01) NO. FURNACE AND ONE (01) NO. AIR POLLUTION CONTROL DEVICE OPERATORS (SKILLED CATEGORY) HAVING ABILITY OF FAULT-FINDING, MINOR REPAIRING CONNECTED WITH THE ELECTRIC FURNACES, ELECTRIC PANELS, CHARGING TROLLES, HEATING ELEMENTS, LIGHTING ACCESSORIES,MECHANICAL, WATER CIRCULATION, SLURRY WATER DISCHARGE SYSTEM INCLUDING DAMPER ID FAN OPERATION. |
| 2 | ENGAGEMENT OF TWO (02) NOS. BODY CHARGING TROLLEY OPERATORS (UNSKILLED CATEGORY STAFF) |
| 3 | ENGAGEMENT OF ONE (1) NOS. HELPER (UNSKILLEDCATEGORY STAFF) FOR ASSISTING FURNACE AND AIR POLLUTION CONTROL DEVICE OPERATORS. |
| 4 | PROPORTIONATE CASUAL LEAVE IMPOSED AS PER MPL. SECRETARY'S CIRCULAR NO.23 OF 2012-13 DT. 10.12.12 VIDE THE MIC ITEM NO.M 39.7 DT.14.08.12 ADDING THE TOTAL WAGES AMOUNT 4.53% OF SL. NO. [1]+[2]+[3] |
| 5 | ENGAGEMENT OF A RELIVER FOR THE FURNACE AND APCOPERATORS (SKILLED CATEGORY) IN THE WEEKLY OF- DAYS. [TOTAL NOS. OF OFF-DAYS FOR AN OPERATOR IN A YEAR = 52 NOS. TOTAL NOS. OF OFF-DAYS OF 2 NOS. OPERATORS IN A YEAR = 52 X 2 = 104 DAYS.] |
| 6 | ENGAGEMENT OF RELIEVER FOR THE TROLLEY OPERATORS(UNSKILLED CATEGORY STAFF) IN THE WEEKLY OF- DAYS. [TOTAL NOS. OF OFF-DAYS FOR A TROLLEY OPERATORS IN A YEAR = 52 NOS. TOTAL NOS. OF OFF-DAYS OF 2 NOS. HELPERS IN A YEAR = 52 X 2 = 104 DAYS.] |
| 7 | ENGAGEMENT OF A RELIEVER FOR THE HELPER (UNSKILLED CATEGORY) IN THE WEEKLY OF- DAYS. [TOTAL NOS. OF OFF-DAYS FOR A HELPER IN A YEAR = 52 NOS.] |
| 8 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FORMONTHLY AS PER DIRECTED BY EIC, REMOVING THE CARBON AND PARTICLE/SLUDGE ARRESTED BY CERAMIC SADDLES (3000 NOS. PER STAGE FOR TWO STAGES FOR TOTAL OF 6000 NOS.) FROM THE SCRUBBER/PRECOOLER AND CLEANING OF THE SAME IN TWO STAGES. TWO NOS. OF STAINLESS-STEEL STRAINER /NET TO BE CLEANED BY WAY OF HIGH-PRESSURE JET PUMP AND BY SCRUBBING HAMMER MANUALLY. (PRECAUTION TO BE TAKEN FOR FRESH AIR CIRCULATION DURING CLEANING INSIDE) |
| 9 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FORMONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60(SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. |
| 10 | (AS PER PRESENT MARKET PRICE):LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CLEANING OF BLOWER BY OPENING THE INLET HUB AND REMOVING CANVAS CLOTH. THE DEPOSITED CARBON FROM INSIDE THE BLOWER TO BE CLEANED MANUALLY AND BY HIGH-PRESSURE JET PUMP. AFTER CLEANING THE INLET HUB TO BE REFITTED AND CANVAS CLOTH TO BE RE-WRAPPED. |
| 11 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CHIMNEY DOOR TO BE UNSCREWED AND DEPOSITED CARBON PARTICLES ARE TO BE MANUALLY REMOVED FROM INSIDE THE CHIMNEY BASE AND WASHED WITH WATER. REMOVED CARBON PARTICLES TO BE PACKED UP IN GUNNY BAGS AND DROPPED AT THE DEPARTMENTAL VAT. |
| 12 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FORCLEANING THE INSIDE OF DUCT PASSAGE BY OPENING INSPECTION COVER WITH VACUUM CLEANER AND MANUALLY. |
| 13 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FORCLEANING AND CHECKING THE MAJOR PARTS BY OPENING THE CHARGING TROLLEY. |
| 14 | (AS PER PRESENT MARKET PRICE):LABOUR CHARGES FOR CLEANING THE CHAIN SPROCKET BY OPENING BACK PORTION OF THE FRONT DOOR AND ADJUSTING THE COUNTER BALANCING WEIGHT TO MAKE FREE MOVEMENT OF THE DOOR. Please Enable Macros to View BoQ information |