| 1 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5m |
| 2 | Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 17.1.1.1 |
| 3 | Add extra for overall depth of excavation above 3.0 m and upto 4.5 m over item no 17.1.1.1 |
| 4 | Add extra for overall depth of excavation above 4.5 m and upto 6.0 m over item no 17.1.1.1 |
| 5 | Add extra for overall depth of excavation above 6.0 m and upto 7.5 m over item no 17.1.1.1 |
| 6 | Add extra for overall depth of excavation above 7.5 m and upto 9.0 m over item no 17.1.1.1 |
| 7 | Add extra for overall depth of excavation above 7.5 m and upto 9.0 m over item no 17.1.1.1 |
| 8 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL. Depth upto 3.0 m |
| 9 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL. Depth more than 3.0 m amd upto 6.0 m |
| 10 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL. Depth beyond 6.0 m |
| 11 | Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL Depth upto 3.0 m |
| 12 | Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL Depth more than 3.0 m and upto 6.0 m |
| 13 | Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL Depth beyond 6.0 m |
| 14 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. Bituminous courses |
| 15 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. Granular courses |
| 16 | Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. |
| 17 | Providing and laying un-reinforced, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant, transported to site, laid spread, compacted and finished in a continuous operation including provision of contraction, expansion, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. cement concrete 1:3:6 |
| 18 | Providing and laying un-reinforced, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant, transported to site, laid spread, compacted and finished in a continuous operation including provision of contraction, expansion, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. cement concrete 1:4:8 |
| 19 | Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. PCC/ RCC Grade M -20 |
| 20 | Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. PCC/ RCC Grade M -25 |
| 21 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. Hand broken - Grade-I (90-45mm) |
| 22 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. Hand broken - Grade-II (63-45mm) |
| 23 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. Crusher broken - Grade-II (63-45mm) |
| 24 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. Crusher broken - Grade-III (53-22.4mm) |
| 25 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. |
| 26 | Extra for additional bitumen emulsion used in above item for every 1 kg per 10 sqm including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. |
| 27 | Providing and laying open graded premix carpet 20mm thick (compacted), on prepared surface in a single course as wearing course, composed of specified graded crushed stone aggregate as per Table 500-23, premixed with bituminous binder @ 14.60 kg/ 10sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required), including loading of material with F.E. loader, hot mixing of stone aggregate and bitumen in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control to the required level and grade, compacting smooth wheeled roller 8-10 tonne capacity and finishing to required level to achieve the desired density as per clause 511 of MoRT&H specification including all material, labour, machinery, lighting, guarding but excluding cost of tack coat/ seal coat under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. With Bitumen VG-grade 30 |
| 28 | With bitumen of grade CRMB-60 |
| 29 | Providing and applying liquid seal coat type \\"A\\" comprising of a layer of bituminous binder @ 9.8 kg/ 10 Sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) followed by a cover of stone chipping @ 0.09 Cum/10 sqm of specified grading and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H specification including all material, labour, machinery, lighting, guarding under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. With Bitumen VG-grade 30 |
| 30 | With bitumen of grade CRMB-60 |
| 31 | Providing and applying premixed seal coat Type \\"B\\" comprising of thin application of fine aggregate 0.06 Cum/ 10 sqm premix with bitumen binder @ 6.8 Kg/ 10 Sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) laying with paver finisher with electronic sensor control and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H specification including all material, labour, machinery, lighting, guarding under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. With Bitumen VG-grade 30 |
| 32 | With bitumen of grade CRMB-60 |
| 33 | Providing at site, lowering & laying in trenches, aligning & jointing ofRCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. 150 mm internal diameter |
| 34 | 200 mm internal diameter |
| 35 | 250 mm internal diameter |
| 36 | 300 mm internal diameter |
| 37 | 350mm internal diameter |
| 38 | 400mm internal diameter |
| 39 | 450mm internal diameter |
| 40 | 500mm internal diameter |
| 41 | 600mm internal diameter |
| 42 | 700mm internal diameter |
| 43 | 800mm internal diameter |
| 44 | 900mm internal diameter |
| 45 | 1000mm internal diameter |
| 46 | 1100mm internal diameter |
| 47 | 1200mm internal diameter |
| 48 | 1400mm internal diameter |
| 49 | 1600mm internal diameter |
| 50 | 1800mm internal diameter |
| 51 | 2000mm internal diameter |
| 52 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended up to date), with internal High Alumina Cement (HAC) mortar lining for gravity sewer network with rubber ring (EPDM) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per technical specifications and as per direction of Engineer. Note : E/w to be measured and paid separately. 100mm |
| 53 | 150mm |
| 54 | 200mm |
| 55 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 110 mm Nominal Dia |
| 56 | 160 mm Nominal Dia |
| 57 | 200 mm Nominal Dia |
| 58 | 250 mm Nominal Dia |
| 59 | 315 mm Nominal Dia |
| 60 | Providing at site, lowering & laying in trenches, aligning & jointing of U-PVC pipe as per IS 13592 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer for house sewer connection work. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 110 mm Nominal Dia |
| 61 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on 6.3mm sheive, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer. 100 mm internal diameter |
| 62 | 150 mm internal diameter |
| 63 | 200 mm internal diameter |
| 64 | 250 mm internal diameter |
| 65 | 300 mm internal diameter |
| 66 | 350mm internal diameter |
| 67 | 400mm internal diameter |
| 68 | 450mm internal diameter |
| 69 | 500mm internal diameter |
| 70 | 600mm internal diameter |
| 71 | 700mm internal diameter |
| 72 | 800mm internal diameter |
| 73 | 900mm internal diameter |
| 74 | 1000mm internal diameter |
| 75 | 1100mm internal diameter |
| 76 | 1200mm internal diameter |
| 77 | 1400mm internal diameter |
| 78 | 1600mm internal diameter |
| 79 | 1800mm internal diameter |
| 80 | 2000mm internal diameter |
| 81 | Providing and constructing of SEWER-BRICK masonry circular manholes of \\"Type-A\\" with internal dia 0.90m and depth upto 1.65m having 230mm thick sewer brick masonry wall in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole \\"Type-A\\" of depth 0.90 m |
| 82 | Providing and constructing extra depth of manhole \\"Type-A\\" for depth beyond 0.90 m and upto 1.65 m with SEWER-BRICK masonary including 20mm plaster inside and outside as per drawing and direction of Engineer. |
| 83 | Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of \\"Type-B\\" with internal dia 1.20m and depth upto 2.50m having sewer brick masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole \\"Type-B\\" of depth 1.70 m |
| 84 | Providing and constructing extra depth of manhole \\"Type-B\\" for depth beyond 1.70 m and upto 2.50 m with SEWER-BRICK masonry including 20mm plaster inside and outside as per drawing and direction of Engineer. |
| 85 | Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of \\"Type-C\\" with internal dia 1.50m and depth upto 5.0m having sewer brick masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m and 460mm from 2.50 to 5.0m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole \\"Type-C\\" of depth 2.60 m |
| 86 | Providing and constructing extra depth of manhole \\"Type-C\\" for depth beyond 2.60 m and upto 5.0 m with SEWER-BRICK masonry including 20mm plaster inside and outside as per drawing and direction of Engineer. |
| 87 | Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of \\"Type-D\\" with internal dia 1.50m and depth upto 9.0m having sewer brick masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m, 460mm from 2.50 to 5.0m and 575mm from 5.0 to 9.0m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole \\"Type-D\\" of depth 5.10m |
| 88 | Providing and constructing extra depth of manhole \\"Type-D\\" for depth beyond 5.10 m and upto 9.0 m with SEWER-BRICK masonry including 20mm plaster inside and outside as per drawing and direction of Engineer. |
| 89 | Construction of brick masonry cylindrical road side inspection chamber of 450mm dia (internal) with 230mm thick wall of brick masonry (75 class designation brick) in cement mortar 1:4 (1 cement : 4 coarse sand), wall 230mm thick, filling of Jhiri, 20mm thick inside and outside plastering with CM (1:3), inside plaster finished with neat coat of cement, with cast in situ PCC M10 grade foundation of 1010 mm dia and 100 mm thickness, 75mm thick PCC M15 flooring, precast SFRC/RCC circular 450mm dia MD manhole frame and cover (as per IS 12592 amended upto date) embedded in 200mm thick PCC M20 grade concrete, including providing and fixing 2 Nos 110mm OD, 0.5m long PVC-U pipe pieces of stiffness class SN 8 as per IS 15328 and plugging the same, testing for water tightness etc. complete as per approved drawing and/or directed by Engineer. Note: Excavation of earth work and road cutting will be measured and paid separately BM Road side inspection chamber of 450mm depth |
| 90 | BM Road side inspection chamber of 600mm depth |
| 91 | BM Road side inspection chamber of 900mm depth |
| 92 | Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer. |
| 93 | Providing PVC-U pipes as per IS 15328 drop connection externally for depth from 0.60 m and upto 1.0 m drop from branch sewer line to main sewer manhole or vice versa including inspection and cleaning eye, PVC-U drop pipe and bend encased around with cement concrete M15 with all form work, cutting holes in walls and making good with brick/ stone masonry work in cement sand mortar 1:4 plastered with cement sand mortar 1:3 with stiff cement mortar 1:1 around PVC-U pipe in masonry wall, making required channels complete as per standard design and specifications and/ or as the directed of the Engineer: 110mm dia |
| 94 | 160mm dia |
| 95 | 200mm dia |
| 96 | Extra for additional drop depth of PVC-U pipes as per IS 15328 drop connection beyond 1.0 m complete as per standard specification and the direction of the Engineer. (To be paid for actual depth beyond 1.0 m) 110mm dia |
| 97 | 160mm dia |
| 98 | 200mm dia |
| 99 | Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by de-plugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer. For manholes of pipes upto 1200 mm dia |
| 100 | For Manholes of above pipes from 1200 mm dia and upto 1500 mm dia |
| 101 | For manholes of pipes above 1500 mm dia and upto 1800 mm |
| 102 | Raising circular brick/RR stone masonry manhole with circular opening 560mm dia and frame slab to required level including dismantling existing slab, taking out the existing CI frame & cover of manhole and raising it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed by Engineer. (Brick work / RR stone work of raising depth of manhole to be paid separately) |
| 103 | Raising circular inspection chamber with circular cover 450mm dia and frame slab to required level including dismantling existing slab, taking out the existing CI frame & cover of inspection chamber and raising it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed by Engineer. (Brick/ concrete work of raising depth of manhole to be paid separately) |
| 104 | Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer. |
| 105 | Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. HD-20 |
| 106 | Supplying & fixing 560mm opening dia SFRC manhole cover as per IS : 12592-2002 in existing manholes frame complete in all respect as directed by the Engineer. HD-20 |
| 107 | Emptying of domestic septic tank/ soakage well etc, disposing of sludge within a lead of 5km and taking out sewage by mechanical means including refilling with local earth, ramming and compaction in layers, cleaning of site. |
| 108 | Emptying of septic tank/ soakage well etc, disposing of sludge within a lead of 5km and taking out sewage & sludge |
| 109 | Cleaning of RCC / SW / DWC / HDPE pipes and intermediate manholes which includes removal of vegetation, garbage, muck, brick and stone pieces or any type of trash etc. and Flow Test of already laid but not commissioned (including cost and conveyance of water to site, Manpower and machineries deployed) complete by mechanical means in all respect as per direction of Engineer-In-Charge. 150 mm dia |
| 110 | 200mm dia |
| 111 | 250mm dia |
| 112 | 300mm dia |
| 113 | 400mm dia |
| 114 | 450mm dia Please Enable Macros to View BoQ information |