| 1 | CIVIL WORK |
| 2 | Dismantling Interlocking/cement concret or brick or granolithic floors including base concret and including stacking of dismentaled materials as directed by Engineer-in-charge within distance of 60 meters (200 feet) as per UPPWD SOR 2022 SI.No. 697. |
| 3 | Earth work in filling in ordinary soil (Carted Earth), excavation to be in the form or regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layer including ramming & dressing the surface to required level and slopes and also including lift up to 1.5m and lead up to 8 KM the earth cutting to be deposited as spoil banks within 30m distance as per directed by Engineer in charge as per UPPWD SOR 2022 SI.No. 253. |
| 4 | Excavation in foundation in ordinary soil incluidng filling lift up to 1.5 m and lead up to 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 m from the foundation trenches including all T&P etc. complete As per S.I. No. 251. |
| 5 | Cement Concrete with 4 cm, gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 in fondation including supply of all material, labour, T&P etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 281. |
| 6 | 1st class brick work in 4:1 fine sand and cement of 1.25 fineness modulus mortor in foundation & plinth including supply of all material, labour and tools and plants etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 305. |
| 7 | 12mm thick plaster with cement mortar in proportion of 1:4 cement and sand of 1.25 FM over brick work minimum thickness not to be less than 10mm including supply of all material labour T&P etc. complete as per UPPWD SOR 2022 S.I. No. 584. |
| 8 | Construction of granular sub base by providing well graded material spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel rollar to achieve the desired density,complete as per Technical Specification clause 401. |
| 9 | Relaying of old 80mm thick I Shaped Mechanically compressed interlocking cement concrete pavers block manufactured by high pressure & controlled vibration machine having plan dimension 200 x (160+120) mm with minimum 5mm thick topping of D.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30 MPa & kg/no. including cost of all material, labour, T&P etc. required for proper completion of the work as per SOR-2017 S.I. No. NS-1 (c). |
| 10 | Supply and laying of 80mm thick rubber mould Zig Zag Shaped Mechanically compressed interlocking cement concrete pavers block manufactured by high pressure & controlled vibration machine having plan dimension 250 x 125mm with minimum 5mm thick topping of D.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30 MPa & kg/no. including cost of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge as per SOR NS-2(ii) |
| 11 | Laying Cement Concrete road, slab consisting of 1:2:4 cement, coarse sand and approved 20mm gauge stone ballast over prepared sub-grade after its rectifications & bringing it to proper camber and including supply of all material, labour, T&P etc. required for proper completion of the work, finished to required template as directed by E/I. but excluding cost metal required for reflection of the sub-grade As per UPPWD SOR 2022 S.I. No. 773. |
| 12 | R.C.C. Work with cement, approved coarse sand and 2 cm gauge approved stone ballast in proportion of 1:1.5:3 in R.C.C. T. beam and slab and R.C.C. column excluding its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.,and also including supply of all material required for proper completion of the work. Binding wire to be supplied by the contractor free of cost As per UPPWD SOR 2022 S.I. No. 288(A). |
| 13 | Mild steel work (TMT Bar HYSD) such as in reinforced concrete work wrought to required shape as necessary including bending and also including supply of steel and wastages and overlapping and hooks required for completion of the work As per UPPWD SOR 2022 S.I. No. 504. |
| 14 | Supply and Laying of 450 mm dia NP-3 Hume pipe with coller jointing with cement mortor including Loading Unloading charge, labour, T&P etc. complete but including cost of hume pipe as per UPPWD SOR 2022 SI.No.NS-5 (A) (v). |
| 15 | Mild steel or iron work in heavy sizes such as trusses, built up gates, door frames, records racks, roof work, gates etc. wrought to required form, including drilling holes, riveting or weling where necessary and also including supply of steel, bolts, nuts and wastages etc. and their fixing required for completion of the work As per UPPWD SOR 2022 S.I. No. 503 as per direction of Engineer-In-Charge. |
| 16 | Painting or varnising on iron work in small areas on new iron work with one coat of ready mixed priming paint and one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S.I. No. 103-1950 as per UPPWD SOR 2022 SI. No. 641 as per direction of Engineer-In-Charge. |
| 17 | Wall painting two coats with plastic emulsion paint of first quality approved brand and manufacture on decorated wall surface to give and even shed including thoroughly brushing the surface free from the mortar and dropping and other foreign matter and sand prepared smooth complete as per UPPWD SOR 2022 NBO 18:57 as per direction of Engineer-In-Charge. |
| 18 | Supply and Fixing of C.C. chair including cost of all material labour T&P etc. complete. |
| 19 | Supply and Fixing of Granite stone display board with fixing in brick masonry wall, lettering & painting including supply of all material, labour, plastering etc. complete required for proper completion of the work. |
| 20 | GST Please Enable Macros to View BoQ information |