| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 4 | Providing and fixing red sand slab 40mm thick over drain. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls Under 20 cm wide. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Providing and laying RMC of M-30 grade By using minimum 350kg of cement(43 grade, OPC) per cum of concrete in roads / streets manufactured in automatic RMC plant using coarse sand and graded stone aggregate of 20mm nominal size in appropriate proportion as per approved design criteria including transportation to site in transit mixer, including cost of admixture in recommended proportion as per IS9103 to accelerate/ retard setting of concrete to improve workability with out impairing strength and durability as per specification including spreading and compacting mechanically by using needle and surface vibratos, leveling to required slope & camber, finishing by floating & brooming with wire brushes etc. and curing including making provision for contraction / expansion, construction of cross / longitudinal joints of size 10mm wide 50mm deep by groove cutting machine, providing and filling joints with approved joint filler and sealants, etc. complete, as per direction of Engineer in-charge. (Cost of joint filler & sealants shall be paid for separately under relevant items).Note:- Cement content considered in M-30 is @ 350 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately M-30 RMC by using minimum cement @350 kg/cum. Cement concrete manufactured in automatic batching plant (RMC plant) including transportation to site in transit mixer. Total Please Enable Macros to View BoQ information |