| 1 | Earth work in filling in ordinary soil including leveling dressing and ramming and also including cartage of 4.00 km distance inluding loading (Excluding royality) S1 253+ cartage + cost of earth etc) |
| 2 | Cement concrete with 4 cm (1.5 inch) gauge approved stone, ballast, approved coarse sand and cement in the proportion of 8:4:1 Including supply of all materials, labour and T&P etc required for proper completion of the work (SI no 281) |
| 3 | First class brick work with 1:4 cement and coarse sand in Super structure in .23 mm thick wall including supply of all material labour T&P etc: required for the proportion of the work as per (S.I.305) |
| 4 | 12 mm thick plaster with cement and course sand of 1.25 FM. Mortar in 1:4 brick work minimum thickness not to be less than 3/8\\" (10 mm) thick, including supply of all materials, labour and T&P etc required for proper completion of the work. (S.I. No. 584 i) |
| 5 | Cement concrete with 2 cm (1.5 inch) gauge approved stone, ballast, approved coarse sand and cernent in the proportion of 4:2:1 including supply of all materials, labour and T&P etc required for proper completion of the work (S. I no. 279(i) |
| 6 | two or more coal applied 167 tr/10 sqm over and including base coat water proofing cement paint applied @2.20kg /10sqm DSR 13.46.1 |
| 7 | Poviding and applying plaster of paris putty of 2mm thicknen over platered surface to prepare ------------------smooth complete(dar no. 13.80) |
| 8 | Construction of granular sub base (GSB) by provided close graded material--------------complete as per 401 (Analysis) |
| 9 | P/L of factory made 80 mm thick interlocking cement concrete tiles (30mpa) including 25 mm thick compacted bed of fine sand directed by Engineer in charge (pwd sor road work new item no. 1). |
| 10 | providing and fixing on wall face unplasticised Regid PVC water pipes conforming to IS:13592 type A, including jointing with sealing conforming to IS:5382, leaving 10mm gap for thermal expansion, (i) singlesocketed pipes. 110 mm diameter DSR NO 12.41.2 |
| 11 | Mild steel or iron work of small size and sections such as holding down bolts, hold fast, tie roads, gratings etc. (when not Included in an over all rates) wrought to required form, including of supply of steel, bolts, nuts and wastage etc. and its fixing required for proper completion of work Same as item No. 502 but of fabrication of door and window frame Including cost of hinges.SI 502B |
| 12 | Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes,fine steel/wood scrappers sand papering and knotting including cost of all materials, labour abd T&P etc SI Painting work 1 |
| 13 | Painting first coat over priming coat(but excluding cost of priming coat) on wood or steel and other metal surface with superior synthetic enamel standard make brushing to give an even shade and finish and Including cleaning the surface of all dirt dust and other foreign matter sand papering and stripping including cost of all materials labour T&P etc required for the proper compltion of work ,SI Painting work 1b Please Enable Macros to View BoQ information |