| 1 | Road WorksEarth work in filling in ordinary soil including leveling dressing and ramming and also including cartage 4.00 Km distance Including loading unloading cost of earth royalty etc. all complete as per direction of E/I Excluding royalityNote: Quantity & Cartage shall be executed as per site required and approvel of Engineer in charge.PWD SOR 2023 ITEM No. 253+ cartage+ cost of earth etc (rate is taken from bond no.1548) |
| 2 | Extra for machnical compection of Earth including of levelling, dressing, watering & compacting the soil to achieve 95% proctor density etc. all complete. P.S.(rate is taken from bond no.1548) |
| 3 | Construction of granular sub base (G.S.B.) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, compete at per clause 401.(Analysis Rate)(rate is taken from bond no.1548) |
| 4 | Providing laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material to site laying in uniform layers with paver finisher in sub base/ base course on well prepared surface and compcting with vibratory roller to achieve the desired density. complete in all respect. as per MORTH specification 406.(Analysis Rate) (rate is taken from bond no.1548) |
| 5 | Providing and applying bitumen emulsion tack coat with butumenus grade VG-10 over prepare surface of granuler base(primer coat) including cleaning of road sruface sand spreading tack coat @ 0.50 Kg/ sqm using machanical means as per morth (Morth 502)(Analyis Rate) (rate is taken from bond no.1548) |
| 6 | First layer of DBM 50mm thick Providing and laying dense graded bitumenous concrete(DBM) with (VG-30) 100-120 TPH batch type HMP prooducing an average output of 75 tonnes per hour using brushed aggregates of spcified gading premixed with bitumenous binder @ 4.0 % to 4.50% by weight of total mix and filler transpored to site laid over a previous prepared surface with paver finisher to the required grade level and alingment and rolled as per clause 501.6 and 501.7 to achieve the desire compaction all complete as per morth specification morth-504(Analysis Rate) (rate is taken from bond no.1548) |
| 7 | Providing and applying bitumen emulsion tack coatwith butumenus grade VG-10 over bituminious surface of including cleaning of road sruface sand spreading tack coat @ 0.20 Kg/ sqm using machanical means as per morth (Morth 503)(Analysis Rate) (rate is taken from bond no.1548) |
| 8 | Providing and laying bitumenous concrete (BC) 25 mm thick with (VG-30) 100-120 TPH batch type HMP prooducing an average output of 75 tonnes per hour using brushed aggregates of spcified gading premixed with bitumenous binder 60/70 grade @ 5.0 % of mix & filler transpored the hot mix to site laying with a hydrostatic paver finisher with sensor control to the required grade level and alingment and rolling with smooth wheeled vibratory and tendom rollers as per MORTH specification clause no. 509 complete in all respcet.(Analysis Rate) (rate is taken from bond no.1548) |
| 9 | First class brick work in 1:4 (one part of cement and four part of coarse sand) cement mortar in foundation and plinth incluidng supply of all material. Labour T&P etc required for proper completion of work.PWD SOR 2023 Item No. 305 |
| 10 | PARKExcavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. including royality.P.W.D. SOR 2023 Item No. 251 |
| 11 | Concrete with 4cm guage stone ballast,course sand of 2.75 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material, labour and T&P etc. required for proper completion of the workP.W.D. SOR 2023 Item No. 281 |
| 12 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cumDSR 2023 Item No. 5.33.1.1 |
| 13 | Providing and laying in position M25 ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of theDSR 2023 SI NO.5.33.2.1 |
| 14 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.P.W.D. SOR 2023 Item No. 504 |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concreteDSR 2023 Item No. 5.9.1 |
| 16 | CENTRING AND SHUTTERING IN COLUMN DSR 2023 SI NO.5.9.6 |
| 17 | CENTRING AND SHUTTERING IN BEAM DSR 2023 SI NO.5.9.5 |
| 18 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i |
| 19 | First class brick work in 1:4 (one part of cement and four part of coarse sand) cement mortar in foundation and plinth incluidng supply of all material. Labour T&P etc required for proper completion of work.P.W.D. SOR 2023 Item No. 305 |
| 20 | First class brick work in super structure for 9\\" thick wall 1:4 (one part of cement and four part of coarse sand) cement mortar incluidng supply of all material. Labour T&P etc required for proper completion of work.P.W.D. SOR 2023 Item No. 303+309+310a |
| 21 | 12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work.(rate is taken from bond no.1548)P.W.D. SOR 2023 |
| 22 | Providing and applying white cement of average thickness1 mm, of approved brand and manufacturer, over the plastered wallsurface to prepare the surface even and smooth complete. Dsr 2023 SI NO.13.80 RATE 156.05X.756=118.97 |
| 23 | P/L 25 mm thick cement concrete DPC 1:1.5:3 including waterproffing material as ordered by Engineer In Charge for ratio as spepify the manufacturer.P.W.D. SOR 2023 Item No. S.I. 361(a) |
| 24 | Painting bitumen on DPC 1.7 Kg/Sqm 85/50 or 85/25 all complete .P.W.D. SOR 2023 New Item No.1 Ch-7 |
| 25 | PARKING WORK Construction of granular sub base (G.S.B.) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, compete at per clause 401.(Analysis Rate) |
| 26 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cumDSR 2023 Item No. 5.33.1.1 |
| 27 | CC/RCC Pavement finishing work including screening &vaccuming ,dewatering by plant finishing surface by trimix flotater and surface hardener @4.00kg/sqm in final finishing making pattern by brooms as per direction by engineer in charge item no NS/MR (RATE TAKEN FROM RAMAYAN VATIKA) |
| 28 | Providing and fixing pre-moulded joint filler in expansion joints ofRCC roads / CC pavements after making the joints dust free withhigh pressure air jet cleaners, all complete as per direction of theEngineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumenhot sealing compound impregnated fibre board having impregnationmore than 35%, conforming to IS:1838 for fibre board and IS: 1834for hot sealing bitumen compound grade A.)DSR 2023 SI NO. 16.45 RATE 5.30X.756=4.00RS/PER CM DEPTH PERCM WIDHT PER MTR LENGTH |
| 29 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concreteDSR 2023 Item No. 5.9.1 |
| 30 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i |
| 31 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.P.W.D. SOR 2023 Item No. 504 |
| 32 | ELECTRIC TRENCH WORK Conctete with 4cm (1½\\") guage approved stone ballast approved coarse sand and cement in proportion of 8:4:1 foundation and under floor, including supply of all material labour and T&P etc required for proper completion of the work.P.W.D. SOR 2023 Item No. 281 |
| 33 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cumDSR 2023 Item No. 5.33.1.1 |
| 34 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concreteDSR 2023 Item No. 5.9.1 |
| 35 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roof , landings, balconies, acessess platformD.S.R. 2023 Item No. 5.9.3 |
| 36 | CENTERING AND SHUTTERING IN WALL DSR 2023 SI NO.5.9.2 |
| 37 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.P.W.D. SOR 2023 Item No. 504 |
| 38 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i |
| 39 | DRAIN WORK Conctete with 4cm (1½\\") guage approved stone ballast approved coarse sand and cement in proportion of 8:4:1 foundation and under floor, including supply of all material labour and T&P etc required for proper completion of the work.P.W.D. SOR 2023 Item No. 281 |
| 40 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cumDSR 2023 Item No. 5.33.1.1 |
| 41 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concreteDSR 2023 Item No. 5.9.1 |
| 42 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roof , landings, balconies, acessess platformD.S.R. 2023 Item No. 5.9.3 |
| 43 | CENTERING AND SHUTTERING IN WALL DSR 2023 SI NO.5.9.2 |
| 44 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.P.W.D. SOR 2023 Item No. 504 |
| 45 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i |
| 46 | Sewarage WorkExcavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5m & lead upto 30m including filling, watering and ramming of excavated earth into the trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer incharge upto adistance of 30 m from the foundation trenches (excluding royalty)P.W.D. SOR (2023) ITEM No. 251 |
| 47 | Providing and fixing of open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered) depth 1.5mt to 3.00 mt all complete as directed by E/ID.S.R. 2023 Item No. 2.20.2 |
| 48 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :mm Internal Diameter R.C.C. pipe(a) 250 mm dia.DSR 2023 Item No. 19.6.3 |
| 49 | Providing and fixing in position the precast cement concrete in 1:2:4, 250mm saddle piller with 20mm guage stone grit coarse sand and cement as per drawing for different dia of pipe including rendring the surface smooth and cost of frame work including all labour T&P etc. required for proper completion of the work as directed by the E/I (Approved rate)250MM dia Saddle pillerP.S. |
| 50 | Construction of RCC rectangular man hole of size 900x1200x1500mm internal size with M25 grade ready mix cement concrete, foundation concrete of 1:4:8 (1 cement : 4 coarse sand: 8 stone aggregate of 40mm size) and making necessary channel with cement concrete 1:2:4(1 cement : 2 coarse sand: 4 stone aggregate of 20mm size) finished with floating coat of neat cement, HD 20 circular man hole cover of size 600mm dia, foot rest of 20x20mm size rectangular cast iron and orange colour PVC coated. including cost of all material, labour, T&P, centering and shurttering etc. required for proper completion of the work as per design.Analysis Rate |
| 51 | Addition/subtraction for extra labour and material for depth of RCC rectaongular man hole/shaft of size 900x600x1500mm internal size with M25 grade ready mix cement concrete, . including cost of all material, labour, T&P, centering and shurttering etc. required for proper completion of the work as per design.Analysis Rate |
| 52 | Construction of RCC rectaongular man hole/chamber of size 900x600x1500mm internal size with M25 grade ready mix cement concrete, foundation concrete of 1:4:8 (1 cement : 4 coarse sand: 8 stone aggregate of 40mm size) and making necessary channel with cement concrete 1:2:4(1 cement : 2 coarse sand: 4 stone aggregate of 20mm size) finished with floating coat of neat cement, HD 20 circular man hole cover of size 600mm dia, foot rest of 20x20mm size rectangular cast iron and orange colour PVC coated. including cost of all material, labour, T&P, centering and shurttering etc. required for proper completion of the work as per design.Analysis Rate |
| 53 | Addition/subtraction for extra labour and material for depth of RCC rectaongular man hole/shaft of size 900x1200x1000mm internal size with M25 grade ready mix cement concrete, . including cost of all material, labour, T&P, centering and shurttering etc. required for proper completion of the work as per design.Analysis Rate |
| 54 | Construction of brick masonery chamber rectaongular type of size 60x60x75cm internal size with M150 grade brick masonery in cement mortar 1:4 (1 cement : 4 coarse sand) and 12mm thick cement plaster in 1:4 (1 cement : 4 Coarse sand) with a floating coat of neat cement, 8 cm thick cement concrete of 1:4:8 (1cement:4 Coarse sand : 8 brick ballast) making necessary channel with cement concrete 1:2:4(1 cement : 2 coarse sand: 4 stone aggregate of 20mm size) finished with floating coat of neat cement, HD 10 rectangular cover of size 45x45cm with frame, including cost of all material, labour, T&P, centering and shurttering etc. required for proper completion of the work as per design.Analysis Rate |
| 55 | Providing & laying cement concrete 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)PWD SOR 2023 Item no. 281 |
| 56 | C.C. 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)PWD SOR 2023 Item No. 279 |
| 57 | Providing and laying non-pressure NP2 class (light duty) R.C.C.pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 150 mm dia. R.C.C. pipeD.S.R. Item No. 19.6.2 |
| 58 | Excavatiing trenches of required width for pipes, cables, etc.including excavation for sockets, depth upto 1.5mt including getting out the excavated materilas returning the soil as pequired in layers not exceeding 20cm in depth, including consolidating each deposited layers by ramming, watering etc. and dispositing of surplus exacavated soil as directed within a lead of 50mpipes cables etc. exceeding 80mm dia but not excaeding 300mm dia.DSR 2023 Item No. 2.10.1.2 |
| 59 | Water SupplySupply of following dia class-C P.V.C. pipe of 6 Kg/Cm2 working presuure (make supreme, Trupari, Prince and astral) confirming to IS:4985 with suitable coupline/socket and cement solutions etc.including loading unloading cartage to site and excluding GST complete in all respect.110mm dia PVC pipe 6Kg/Cm2Analsis Rate/P.S. |
| 60 | Supply and stacking of approved quality heavy duty PVC moulded specials (supreme and astral make) required for laying and jointing of PVC pipe at site of work. PVC tee 110x110x110mm (heavy duty)Analsis Rate/P.S. (rate is taken from bond no. 1548 ) |
| 61 | PVC Bend/elbow 110mm dia (heavy duty)Analsis Rate/P.S. (rate is taken from bond no. 1548 ) |
| 62 | PVC tee 140x140x140mm (heavy duty)Analsis Rate/P.S. (rate is taken from bond no. 1548 ) |
| 63 | PVC Bend/elbow 140 X 140mm dia (heavy duty)Analsis Rate/P.S. (rate is taken from bond no. 1548 ) |
| 64 | End cap 110mm diaAnalsis Rate/P.S. (rate is taken from bond no. 1548 ) |
| 65 | Reducer 140 x 110 mm dia (heavy duty)Analsis Rate/P.S. |
| 66 | Excavatiing trenches of required width for pipes, cables, etc.including excavation for sockets, depth upto 1.5mt including getting out the excavated materilas returning the soil as pequired in layers not exceeding 20cm in depth, including consolidating each deposited layers by ramming, watering etc. and dispositing of surplus exacavated soil as directed within a lead of 50mpipes cables etc. exceeding 80mm dia but not excaeding 300mm dia.DSR 2023 Item No. 2.10.1.2 |
| 67 | Carting & laying and jointing of following dia PVC pipe and specials with specified cement except jointing of fire hydrent and sluice valve all coplete including supply of all materials labour T&P etc. required for proper completion of work excluding supply of pipe and special but including supply of specified jointing cement as directed by E/I110mm diaAnalsis Rate/P.S. |
| 68 | Plot connection Providing connection on main water line with G.I. clamps nuts socket also including 2mt long 15mm dia CPVC pipe with end cap rate as perDSR 2023 Item No. 18.13.1 |
| 69 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including all CPVCplain & brass threaded fittings This includes jointing of pipes & fittingswith one step CPVC solvent cement, trenching, refilling & testing ofjoints complete as per direction of Engineer in Charge. 20MM DIA NOMINAL BORE DSR 2023SI NO. 18.9.2 |
| 70 | PART (B) ROAD WORKEarth work in filling in ordinary soil including leveling dressing and ramming and also including cartage 4.00 Km distance Including loading unloading cost of earth royalty etc. all complete as per direction of E/I Excluding royalityNote: Quantity & Cartage shall be executed as per site required and approvel of Engineer in charge. (rate is taken from bond no. 1548 ) PWD SOR 2023 |
| 71 | Providing and applying bitumen emulsion tack coatwith butumenus grade VG-10 over bituminious surface of including cleaning of road sruface sand spreading tack coat @ 0.20 Kg/ sqm using machanical means as per morth (Morth 503)(Analysis Rate) (rate is taken from bond no. 1548 ) |
| 72 | Providing and laying bitumenous concrete (BC) 25 mm thick with (VG-30) 100-120 TPH batch type HMP prooducing an average output of 75 tonnes per hour using brushed aggregates of spcified gading premixed with bitumenous binder 60/70 grade @ 5.0 % of mix & filler transpored the hot mix to site laying with a hydrostatic paver finisher with sensor control to the required grade level and alingment and rolling with smooth wheeled vibratory and tendom rollers as per MORTH specification clause no. 509 complete in all respcet.(Analysis Rate) (rate is taken from bond no. 1548 ) |
| 73 | PARK WORK.Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. including royality.P.W.D. SOR 2023 Item No. 251 |
| 74 | Concrete with 4cm guage stone ballast,course sand of 2.75 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material, labour and T&P etc. required for proper completion of the workP.W.D. SOR 2023 Item No. 281 |
| 75 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cumDSR 2023 Item No. 5.33.1.1 |
| 76 | Providing and laying in position M25 ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the DSR 2023 SN. 5.33.2.1 |
| 77 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.P.W.D. SOR 2023 Item No. 504 |
| 78 | Providing and applying white cement of average thickness1 mm, of approved brand and manufacturer, over the plastered wallsurface to prepare the surface even and smooth complete. Dsr 2023 SI NO.13.80 RATE 156.05X.756=118.97 |
| 79 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i |
| 80 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concreteDSR 2023 Item No. 5.9.1 |
| 81 | CENTRING AND SHUTTERING IN COLUMN DSR 2023 SI NO.5.9.6 |
| 82 | CENTRING AND SHUTTERING IN BEAM DSR 2023 SI NO.5.9.5 |
| 83 | First class brick work in 1:4 (one part of cement and four part of coarse sand) cement mortar in foundation and plinth incluidng supply of all material. Labour T&P etc required for proper completion of work.P.W.D. SOR 2023 Item No. 305 |
| 84 | First class brick work in super structure for 9\\" thick wall 1:4 (one part of cement and four part of coarse sand) cement mortar incluidng supply of all material. Labour T&P etc required for proper completion of work.P.W.D. SOR 2023 Item No. 303+309+310(a) |
| 85 | 12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work.P.W.D. SOR 2023 Item No. 584+diff (rate is taken from bond no. 1548 ) |
| 86 | ELECTRIC TRENCH Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, / Ordinary Portland , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cumDSR 2023 Item No. 5.33.1.1 |
| 87 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i |
| 88 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roof , landings, balconies, acessess platformD.S.R. 2023 Item No. 5.9.3 |
| 89 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.P.W.D. SOR 2023 Item No. 504 |
| 90 | Add for using extra cement in the items of design mix over and above the specified cement content therein.PWD SOR Basic Rate of Material 7i Please Enable Macros to View BoQ information |