| 1 | Barricading of three rows with wooden ballies of height of 5 to 6 fects albave the ground level & diameter 10 to 15 cm which is embedded 45 cm below the ground level. |
| 2 | Erection of Check Barriers with Ballies 12 m length operationable including digging holes for fixing vertical poast and binding with nariyal rope all complete as per requirement. Height of vertical post should not be less than 1.8 m above ground level and it should be minimum 0.45 m below ground level. The job work Includes erection & dismantling of harriers and also inclueds reffilling of dugged holes after dismantling of barriers. |
| 3 | For Construction of HelipadClearing and grubbing road land including uprooting rank vegelation, grass, bushes, shrubs, saplings and trees girth up to 300 mm. removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 matres meluding removal and dispusal of top organic soil not exceeding 150 mm in thickness. |
| 4 | For Construction of Helipadsurface dressing |
| 5 | For Construction of HelipadBrick soling with stright over burnt bricks laid on edge and dry including perparation of subgrade for prescribed camber and including supply of bricks filling of joints with local earth spreading blinding coat of 1 cm (3/8\\") depth of local sand over the entire surface and including latiour, T&P etc. required for proper completions of work as per SOR item No 763 For Helipad and Approach Road. (For Helipad) |
| 6 | For Construction of HelipadStuck pointing with cement motor consisting of one part cemet and two part of fine sand of 1.25 F.M. on brick work including supply of all materials labour and T&P etc required for proper complition of work. (For Helipad) |
| 7 | For Construction of HelipadDistempering for Making H Mark and side mark on Helipad as per direction of E/i |
| 8 | For Construction of HelipadConstruction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading. grading to required slope and compacting to meet requirement of table 300-2 (for Approch Road) |
| 9 | For Construction of HelipadBrick soling (for Approch Road) |
| 10 | For Construction of HelipadBarricading of three rows with wooden balles of height of 5 to 6 feets above the ground level & diameter 10 to 15 cm which is ernbedded 45 om below the ground level. (For Helipad) |
| 11 | For Construction of HelipadProviding & Fixing of Security Wire Mesh one inch square wire on a tron angle frames designed in a way such that they can be joined together to provide security for the WIP area on Rental/Hire basis as per direction of Engineer in Charge (For Helipad) |
| 12 | For ParkingClearing and grubbing road land including uprooting rank vegelation, grass, bushes, shrubs, saplings and trees girth up to 300 mm. removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 matres meluding removal and dispusal of top organic soil not exceeding 150 mm in thickness. |
| 13 | For ParkingSurface dressing |
| 14 | For ParkingBarricading of two rows with wooden ballies of height of 5 to 6 feets above the ground level & diameter 10 to 15 cm which is embedded 45 cm below the ground level. |
| 15 | For ParkingConstruction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (for Ramp) Please Enable Macros to View BoQ information |