| 1 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 Sub Head I- MAIN CANAL including dewatering |
| 2 | Excavation in ordinary rock in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 Sub Head I- MAIN CANAL including dewatering |
| 3 | Excavation in hard rock in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 Sub Head I- MAIN CANAL including dewatering |
| 4 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .including dewatering. for MAIN CANAL |
| 5 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M10 (FOR PIER) |
| 6 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 (FOR TRENCHES) |
| 7 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 (IN FOUNDATION) |
| 8 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 |
| 9 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25(IN SUBSTRUCTURE) |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 (in foundation ) |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202(TMT Steel) (IN SUBSTRUCTURE) |
| 12 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202(TMT Steel) (IN SUBSTRUCTURE) (REMAINING CANAL) |
| 13 | Fixing of Rebar of Dia. 16mm to a depth of 100mm with drill dia. 25mm with chemical |
| 14 | Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete. Dumb bell with central bulb (180mm wide, 8mm thick) (22.4.2) |
| 15 | Providing and fixing Escape Gate as per Drawing |
| 16 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.including dewatering, for INSPECTION CHAMBER. |
| 17 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 for INSPECTION CHAMBER |
| 18 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 (IN RAFT) |
| 19 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 (INSPECTION CHAMBER) |
| 20 | Random Rubble Stone Masonry laid in 1:4 cement and sand mortar in structure. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 04, 1202 & 1203 of MORD Specifiction(CHAMBER) |
| 21 | 15mm thick plaster work with cement sand mortar 1:4 as per technical specifications clause 613.4 & 1204 (INSIDE) |
| 22 | Supply and Fixing of PVC foot step (heavy quality) |
| 23 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.FOR DISTRIBUTARY CANAL. including dewatering,for MSERW PIPE CANAL |
| 24 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M10 |
| 25 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 (IN FOUNDATION) |
| 26 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25(IN SUBSTRUCTURE) |
| 27 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications(TMT Steel) (IN FOUNDATION) |
| 28 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications(TMT Steel) (IN SUBSTRUCTURE) |
| 29 | Providing and Laying - Jointing of LOWERING IN TRENCHES WITH TRUE ALIGNMENT of MSERW pipe confirming IS:3589 Fe-410 jointing by electric welding process with proper grade of electrodes suitable for jointing of water supply pipe lines by cutting of pipes and making required bends by welding, completion of work with testing of pipe lines etc. (In Single row) 800 MM DIA . |
| 30 | Laying (First Class) bedding on well compacted, sand, moorum or approved granular material as per clause 1105(ii). |
| 31 | Supply and fixing of 800mm sluice valve as per site conditions. |
| 32 | Fixing of Rebar of Dia. 16mm to a depth of 100mm with drill dia. 25mm with chemical. |
| 33 | Painting on Steel Surfaces Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701. |
| 34 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .including dewatering,DISTRIBUTARY CANAL & OFFSHOOT . |
| 35 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 . |
| 36 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25. |
| 37 | Providing and Laying - Jointing of following dia. 315mm HDPE Pipe PN-10 confirming to IS:4984-1995 with sockets and rubber gaskets to the site of work,lowering the same into trenches below ground level true to of all jointing materials and testing etc. complete but excluding excavation and backfilling of treches upto ground level. (In single row). |
| 38 | Providing and Laying - Jointing of LOWERING IN TRENCHES WITH TRUE ALIGNMENT of MSERW pipe confirming IS:3589 Fe-410 jointing by electric welding process with proper grade of electrodes suitable for jointing of water supply pipe lines by cutting of pipes and making required bends by welding, completion of work with testing of pipe lines etc. (In Single row) 350MM DIA AND 4.8MM THICKNESS |
| 39 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer Including Cost of 6 Nos holes & Cost of Nut Bolt & Rubber Gasket . DSR 10.1 (Inner Dia of Flange dia 359.6mm & Outer dia is 509.6mm with 12mm thick MS Plate . |
| 40 | Laying (First Class) bedding on well compacted, sand, moorum or approved granular material as per clause 1105(ii). |
| 41 | Plain/Reinforced cement concrete in super structure complete as per drawing and technical specifications RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump |
| 42 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 43 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar in structure. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 04, 1202 & 1203 of MORD Specifiction |
| 44 | 15mm thick plaster work with cement sand mortar 1:4 as per technical specifications clause 613.4 & 1204 |
| 45 | Supply and fixing of 300mm sluice valve as per site conditions. |
| 46 | Supply and fixing of 350mm sluice valve as per site conditions. |
| 47 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .including dewatering, for offshoot. |
| 48 | Random Coursed Rubble stone masonry in 1:6 cement and sand mortar in superstructure including supply of all materials, labour,T&P required for proper completion of the work. for offshoot. |
| 49 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M10 (FOR OFFSHOOT) |
| 50 | 15mm thick plaster work with cement sand mortar 1:4 as per technical specifications clause 613.4 & 1204 for offshoot. |
| 51 | Pointing with cement mortar (1:3) on brickwork as per drawing and technicalspecification Clauses 613.3 and 1204 for offshoot. |
| 52 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material,including dewatering .SILT EXCLUDER. |
| 53 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M20 , forSILT EXCLUDER. |
| 54 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 for SILT EXCLUDER. |
| 55 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M35,for SILT EXCLUDER. |
| 56 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M35 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump,for SILT EXCLUDER. |
| 57 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications(TMT Steel) |
| 58 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC M35 HEIGHT UPTO 5M BED SLOPE .for silt excluder |
| 59 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification, for SILT EXCLUDER. |
| 60 | Supply and Fixing of PVC foot step (heavy quality) |
| 61 | Providing and Laying - Jointing of LOWERING IN TRENCHES WITH TRUE ALIGNMENT of MSERW pipe confirming IS:3589 Fe-410 jointing by electric welding process with proper grade of electrodes suitable for jointing of water supply pipe lines by cutting of pipes and making required bends by welding, completion of work with testing of pipe lines etc. (In Single row) 800 MM DIA |
| 62 | Supply and fixing of 800mm sluice valve as per site conditions |
| 63 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material asper direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifications.including dewatering, RR DRY,PROTECTION WORKS. |
| 64 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifications for PROTECTION WORKS. |
| 65 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material asper direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specification. including dewatering,banded RR1:6 for PROTECTION WORKS. |
| 66 | Pointing with cement mortar (1:3) on stonework as per drawing and technicalspecification Clauses 613.3 and 1204 for PROTECTION WORKS. |
| 67 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction for PROTECTION WORKS. |
| 68 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction for PROTECTION WORKS. |
| 69 | Cement concrete grade M 10 in bed of canal PCC Grade M-10(Nominal mix 1:3:6) ,for PROTECTION WORKS. |
| 70 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material .SOLAR LIFTS AND PUMPS WITH MICRO SPRINKLER IRRIGATION.20KL UNDERGOUND WATER TANK.including dewatering. |
| 71 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade for M20 SOLAR LIFTS AND PUMPS WITH MICRO SPRINKLER IRRIGATION. |
| 72 | Random Coursed Rubble stone masonry in 1:6 cement and sand mortar in superstructure including supply of all materials, labour,T&P required for proper completion of the work. for M20 SOLAR LIFTS AND PUMPS WITH MICRO SPRINKLER IRRIGATION. |
| 73 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 for M20 SOLAR LIFTS AND PUMPS WITH MICRO SPRINKLER IRRIGATION. |
| 74 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications(TMT Steel) (SUBSTRUCTURE) for M20 SOLAR LIFTS AND PUMPS WITH MICRO SPRINKLER IRRIGATION. |
| 75 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 for M20 SOLAR LIFTS AND PUMPS WITH MICRO SPRINKLER IRRIGATION. |
| 76 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material,including dewatering .FENCING WORKS |
| 77 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. FENCING WORKS. |
| 78 | Painting on Steel Surfaces Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701.FENCING WORKS |
| 79 | Providing concrete for plain/ reinforced concrete in open foundations complete P.C.C. grade M 20 Nominal mix 1:2:4 (Hand mixed),FENCING WORKS. |
| 80 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm.FENCING WORKS. |
| 81 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material ,including dewatering.PIPELINE |
| 82 | Providing, Lowering into trenches with true to alingment, Laying & Jointing of full lengths of HDPE Pipes of specified grade as per IS:4984-1995 and specifications, with testing of pipe line including supply of jointing materials.PE-80 Grade;PN-6 (6.0Kg/Cm2). 100 mm PN6 for PIPELINE |
| 83 | Providing, Lowering into trenches with true to alingment, Laying & Jointing of full lengths of HDPE Pipes of specified grade as per IS:4984-1995 and specifications, with testing of pipe line including supply of jointing materials.PE-80 Grade;PN-6 (6.0Kg/Cm2). 63 mm PN6 for PIPELINE |
| 84 | Providing, Lowering into trenches with true to alingment, Laying & Jointing of full lengths of HDPE Pipes of specified grade as per IS:4984-1995 and specifications, with testing of pipe line including supply of jointing materials.PE-80 Grade;PN-12.5 (12.5 Kg/Cm2). 100 mm PN 12.5 for PIPELINE |
| 85 | Providing, Lowering into trenches with true to alingment, Laying & Jointing of full lengths of HDPE Pipes of specified grade as per IS:4984-1995 and specifications, with testing of pipe line including supply of jointing materials.PE-80 Grade;PN-12.5 (12.5 Kg/Cm2). 63mm PN 12.5 for PIPELINE |
| 86 | Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I. pipes confirming to IS : 1239 (PART-1) including supply of all jointing materials like specials, white lead, hemp and oil etc in trenches with its cutting, threading and testing of pipe line etc complete.Medium Duty (Class 'B') : 100 mm dia for PIPELINE |
| 87 | Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I. pipes confirming to IS : 1239 (PART-1) including supply of all jointing materials like specials, white lead, hemp and oil etc in trenches with its cutting, threading and testing of pipe line etc complete.Medium Duty (Class 'B') : 65 mm dia for PIPELINE |
| 88 | Providing and fixing Brass metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore for PIPELINE. |
| 89 | Providing and fixing CI metal non- return valve of approved quality (screwed end) :65 mm nominal bore. for PIPELINE. |
| 90 | Providing and Fixing 25 hp Solar submersible pump and solar photo voltic poly crystalline solar module/ pv paney array for required kw as per direction of engineer incharge including the cost of civil work required to install the panels and control panels, solar pump controllar panel (VFD cum starter) for dual (both AC/DC) powered submersibble pump set including inbuild MMPT tracking facility ensuring over load, under voltange protection force air coolled inverse exponible shut down at the time of low radiation, parameter display facilities, dry running protection to avoid dry run of pump set. Manual/ auto run selector switch on panel box. Auto reset after every fault and on/off features depending on water level in tank by sensor based floating switch. The work also includes the cost of GSM sim based mobile phone operating device, float switch with control wire (for tank emply and full), providing and fixing of DC wire and submersible cable of required size, hot deep galvanized steel structure of adequate strength and appropriate design, which can withstand load of modules and high wind velocilities up to 200 kmph and minimum 3 m high from ground level. Lightening arrestor with chemical earthing complete in all respect, chemical earthing of all pv modules mounting structures including chemical, rod and all necessary item, pipe fitting with suitable mm dia size GI pipe, gate valve, reflex valve GI union elbow, nipple, tee etc complete required at site, supply and istallation of DCDB, Installation, testing & commissionning of all above supplied items. for PIPELINE. |
| 91 | Providing and Fixing 15 hp Solar submersible pump and solar photo voltic poly crystalline solar module/ pv paney array for required kw as per direction of engineer incharge including the cost of civil work required to install the panels and control panels, solar pump controllar panel (VFD cum starter) for dual (both AC/DC) powered submersibble pump set including inbuild MMPT tracking facility ensuring over load, under voltange protection force air coolled inverse exponible shut down at the time of low radiation, parameter display facilities, dry running protection to avoid dry run of pump set. Manual/ auto run selector switch on panel box. Auto reset after every fault and on/off features depending on water level in tank by sensor based floating switch. The work also includes the cost of GSM sim based mobile phone operating device, float switch with control wire (for tank emply and full), providing and fixing of DC wire and submersible cable of required size, hot deep galvanized steel structure of adequate strength and appropriate design, which can withstand load of modules and high wind velocilities up to 200 kmph and minimum 3 m high from ground level. Lightening arrestor with chemical earthing complete in all respect, chemical earthing of all pv modules mounting structures including chemical, rod and all necessary item, pipe fitting with suitable mm dia size GI pipe, gate valve, reflex valve GI union elbow, nipple, tee etc complete required at site, supply and istallation of DCDB, Installation, testing & commissionning of all above supplied items. for PIPELINE. |
| 92 | Providing & Fixing Micro Sprinkler Irrigation system including all accessories T & P. for PIPELINE. Please Enable Macros to View BoQ information |