Tender For Procurement Of Tg Cycle Piping Of Ibr & Non Ibr Systems For Mel Mahan (Ph Iii) Project ,- Aux Steam System- Ibr Aux Steam System- Non Ibr Condensate System- Non Ibr, Singrauli-Madhya Pradesh
TDR : 55517361
Tender Notice
BOQ
16 Days Left
Singrauli
Madhya Pradesh
Tender For Procurement Of Tg Cycle Piping Of Ibr & Non Ibr Systems For Mel Mahan (Ph Iii) Project ,- Aux Steam System- Ibr Aux Steam System- Non Ibr Condensate System- Non Ibr
Name of Work:- Procurement of TG Cycle Piping of IBR & Non IBR Systems for MEL Mahan (Ph III) project
Sl. No.
Item Description
1
BoQ_Ver3.0 Item Wise Normal INR Only INR,USD,JPY,EUR Select, Excess (+), Less (-) Tender Inviting Authority: Anil Sree, Manager / MM / RM, BHEL Trichy Name of Work: Procurement of TG Cycle Piping of IBR & Non IBR Systems for MEL Mahan (Ph III) project Contract No: Enq No 4202600008 dt 15.05.2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE1. This BOQ template must not be modified / replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only.2. Quote shall be inclusive of raw material procurement, IBR drawing approval (for IBR Piping), manufacturing / fabrication, internal inspection & testing charges (NDE, heat treatment, chemical / mechanical testing etc), IBR documentation & inspection charges (for IBR Piping), painting and freight charges (Ex-Works offers will not be considered). BHEL’s TPI inspection charges shall be to BHEL’s account. Transit insurance shall be in BHEL’s scope. GST shall be extra and shall not be included in the quoted rates. Refer Annexure D- Terms & Conditions and Annexure E- Special Terms & Conditions of the Enquiry prior to quoting.3. Bidder is requested to exercise utmost caution and take care of Unit of Measurement while quoting the rates.4. In case quoting for a Piping System, all the items of the Piping Systems as per BOM of that Piping System shall be quoted for failing which bid submitted for such Piping System will be rejected. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Piping System Enquiry Schedule No & Piping Requirement (IBR / Non IBR) Quantity UOM Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Quoted rate (on FOR destination respective project site basis) to be entered by the bidder for 1 Set (Rs) GST Percentage(Do not add % symbol) VAT inRs. P GST Amount (Rs) Any Other Taxes/Duties/Levies inRs. P Other Taxes 2 inRs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax inRs. P Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category inRs. P Total Amount excl GST (Rs) Total Taxes (Rs) Total Value for the Piping System incl of GST (Rs) Total Amount in Words
2
Aux Steam System- IBR
3
Aux Steam System- Non IBR
4
Condensate System- Non IBR
5
Drain & Vent Piping- Non IBR
6
Extraction System- IBR
7
Heaters Drain Piping- Non IBR
8
SG Integral Piping- IBR
9
SG Integral Piping- Non IBR
10
Spray Water / Feed Water Piping- IBR
11
Spray Water / Feed Water Piping- Non IBR Total in Figures 0.0 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.