| 1 | Item Description/ Heading |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications) |
| 3 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) |
| 4 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) |
| 5 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC with rotavator and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading-III Material |
| 6 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC with rotavator and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- II Material |
| 7 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M15 |
| 8 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M20 |
| 9 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump |
| 10 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600 |
| 11 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |