| 1 | Road and drain work |
| 2 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means |
| 3 | OD9128/2025-2026:Filling with Quarry waste Filling up low lying and water logged areas with Soil gravel mixture/ quarry waste, spreading in layers, leveling the top at site without consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade. (Based on item No. 24.1 of CTE approved observed data) |
| 4 | OD9127/2025-2026:Filling with Quarry waste Filling up low lying and water logged areas with Soil gravel mixture/ quarry waste, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade. (Based on item No. 24.1 of CTE approved observed data) |
| 5 | OD9129/2025-2026:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material |
| 6 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 |
| 7 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 8 | 12.5.2.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m II. P.C.C. grade M 20 (i) Nominal mix (1:2:4) |
| 9 | 11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25 |
| 10 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 11 | Cover slab placing and inauguration stone |
| 12 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 13 | 8.2.2.2:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm |
| 14 | 16.21:Engraving letters in hard stone |
| 15 | Tile work |
| 16 | OD9130/2025-2026:Providing and laying of Interlock concrete block pavements (Hydraulic) having thickness 80mm(M40) as per drawings and technical specification clause 1504 confirming to IS 15658and laid in required colour and pattern over and including 50 mm thick compactedbed of 6 mm metal excluding edge concreting (Based on item No. 6.2 of CTE approved o/d) Please Enable Macros to View BoQ information |