| 1 | S&F in replacement of danger notice plate of 1.6 mm thick mild steel sheet vitreous enamelled white with letters, figures and conventional skull and bones in signal red colour and fixed with M S Clamps, bolt and nut approved size for HT poles, 25 x 20 cm size including taking out old unserviceable danger notice plate complete all as specified and directed. |
| 2 | S&F in replacement cross arms, bracing, supports, clamps and back plates and S&F in replacement of same item fabricated from Structural Steel Sections including Nuts, Bolts, Washer, welding, bending cold or hot, drilling holes for Bolts, in any shape or size as indicated/ directed and inclusive of two coats of Aluminium Paint over a Coat primer, complete all as specified and as directed. |
| 3 | S&F in replacement Switch Air Break Gang Operated for 11 KV grade triple pole vertically mounted having 12 insulator and fitted on steel frame suitabe for, current rating 400 Amps, mechanically operated mechanism consisting of Operating Rod of GI Pipe 25mm bore (dia) ‘light grade’ of suitable Length worked From Ground Level and with Locking Arrangement Mild Steel Flat Iron Clamp 50x6mm including Expulsion Fuse, Single Pole, Channel type/ drop out type suitable as per Site requirement with Working Pressure 11 KV grade of capacity 50 to 100 Amps including taking down unservice-able Fuse , complete all as specified and as directed. |
| 4 | S&F in replacement anti climbing devices , spikes type fabricated out of MS bars ( round , square and flat) including nuts, bolts , washers and weilding in two halves made to shape to suit the cros section of the pole as ordered complete all as specified and as directed. |
| 5 | Taking down broken/defective PCC/steel tubular pole, keeping away from site and S&F of steel tubular swaged poles complete with cast iron base plate, finial taper plug, bolts, nuts and screws as specified type 410 SP-55 (11 meters long) and applying two coats of aluminum paint over a coat of red oxide primer,the embeded portion shall be applied with two coats bituminous paint complete all as specified and directed.Note : PCC & Earth work will be measured and paid seperately. |
| 6 | S&F replacement of three piece nonlinear resisttor type Lightning Arrester suitable for 3 wire, 11 KV overhead lines with rated voltage 9 KV ( rms) with a nominal discharge current rating of 5 KA and complete with galvanised clamping arrangement, GI bolts , nuts washers etc, complete all as specified and directed. |
| 7 | Supply & laying in replacement of HT XLPE Cable, insulated, screened, PVC bedded, Galvanised Steel Strip or Wire armoured, Electic Power Cable (heavy duty) with Aluminium Conductor, 11 KV, ‘Earthed Grade, cross-sectional area 95 Sqmm 3 Core, laid in Pipe/ Ducts/ Trenches/ under Floor/under Road including Testing and disconnecting & taking out of existing HT cable of any type and size, complete all as specified and as directed.NOTE : Earthworks, sand cushioning and protection of cable etc. will be measured and paid under appropriate Items. |
| 8 | Supply & laying in replacement of LT XLPE insulated, screened, PVC bedded galvanized steel strip or wire armored, electric power cable (heavy duty) with aluminium conductor, 1100 volts (earthed) grade cross sectional area 120 sqmm, 3.5 core laid in trenches/ pipes/ ducts/ wall/ boarings with necessary cable lugs and glands, nuts, bolts and washers etc and testing including disconnecting and taking out of existing LT cable of any type and size complete all as specified and directed.Note:- Earthworks, sand cushioning and protection of cable etc. will be measured and paid under appropriate Items. |
| 9 | All as per item No. 08 above but cross-sectional area 95 sqmm, 3.5 core |
| 10 | M&L for replacement of outdoor cable end termination joint Heat shrink type suitable for 11 KV 50 to 95 sq mm 3 core HT XLPE 11000 volts heavy duty armoured cable complete all as specified and directed. |
| 11 | Dismantling and taking down any type of transformers indoor/outdoor,by disconnect HT & LT connections from plinth/ platform/ pole mounted and shifting to workshop and refix it back on site after all repairs and testing and commissioning, conducting all tests and complete of work all as specified and directed.Note: (i) LV/HV bushes, Silica gel breather etc will be measured and paid for separately.(ii) Draining out all the transformer oil, dismantling and inspection of transformer core and winding including taking out burnt out winding/insulation of LV/HV coils in the presence of the authorized rep and rewinding the damaged core wih suitable gauge of copper winding wire winding, drying out in Heat chamber till specified IR values are obtained and providing new insulation materials, gasket, nuts, bolts, checking of leakages and rectifying the same by welding etc.(iii)While removal of the core care shall be taken not to spoil the transformer oil and required f iltration including topping up shall be carried out, which shall be measured and paid under respective items of schedule for carry out repair (rewinding) works as directed and reinstall back in original location including re-connection of HT & LT supply system including testing complete all as specified and directed for the following capacity. (Note spare items required for repair including rewinding will be measured and paid seperately under respective items of Sch. Please Enable Macros to View BoQ information |
| 12 | Dismantling and taking down any type of transformers indoor/outdoor,by disconnect HT & LT connections from plinth/ platform/ pole mounted and shifting to workshop and refix it back on site after all repairs and testing and commissioning, conducting all tests and complete of work all as specified and directed.Note: (i) LV/HV bushes, Silica gel breather etc will be measured and paid for separately.(ii) Draining out all the transformer oil, dismantling and inspection of transformer core and winding including taking out burnt out winding/insulation of LV/HV coils in the presence of the authorized rep and rewinding the damaged core wih suitable gauge of copper winding wire winding, drying out in Heat chamber till specified IR values are obtained and providing new insulation materials, gasket, nuts, bolts, checking of leakages and rectifying the same by welding etc.(iii)While removal of the core care shall be taken not to spoil the transformer oil and required f iltration including topping up shall be carried out, which shall be measured and paid under respective items of schedule for carry out repair (rewinding) works as directed and reinstall back in original location including re-connection of HT & LT supply system including testing complete all as specified and directed for the following capacity. (Note spare items required for repair including rewinding will be measured and paid seperately under respective items of Sch. Please Enable Macros to View BoQ information |