|
| 1 | M&L for reinforced concrete pipes, class NP-2, laid and jointed with collars of 150 mm bore of pipe including demolition and breaking up drain pipe (salt glazed ware, AC or reinforced concrete ) set in cement mortor, complete all as specified and directed. |
| 2 | M&L for reinforced concrete pipes, class NP-2, laid and jointed with collars of 200 mm bore of pipe including demolition and breaking up drain pipe (salt glazed ware, AC or reinforced concrete ) set in cement mortor, complete all as specified and directed. |
| 3 | M&L for concrete bed for 150 mm dia pipe including packing under and haunching against the sides of pipe after they are laid and tested in cement concrete 1:4:8 type D2 using 40mm graded crushed stone aggregate complete all as specified and directed. |
| 4 | M&L for concrete bed for 200 mm dia pipe including packing under and haunching against the sides of pipe after they are laid and tested in cement concrete 1:4:8 type D2 using 40mm graded crushed stone aggregate complete all as specified and directed. |
| 5 | M&L for cutting into existing manholes for connecting new drains, making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B1 smooth finished, and reforming benching as required for 150mm internal dia of pipe, complete all as specified and directed. |
| 6 | M&L for cutting into existing manholes for connecting new drains, making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B1 smooth finished, and reforming benching as required for 200mm internal dia of pipe, complete all as specified and directed. |
| 7 | Excavation in trenches n'exc 1.5m wide and n'exc 1.5 mtr deep for sewage pipe line and manhole etc and getting out in soft/loose soil, complete all as specified and directed |
| 8 | M&L for cement concrete 1:4:8 type D2 using 40mm graded aggregate as in foundation, complete all as specified and directed |
| 9 | M&L PCC 1:2:4 type B2 as in channel and benching of manholes, complete all as specified and directed |
| 10 | Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred / stopped ends etc., complete all as specified and directed |
| 11 | Returning, filling incl spreading, levelling watreing and well rammingh in layers n'exc 25cm in soft/loose soil for sewage pipe line manholes sides and cleaning the site complete all as specified and directed |
| 12 | Removing excavated material to a distance not exceeding 50m and depositing complete all as specified and directed |
| 13 | Demolition of reinforcement concrete of any description and in any position for manhole cover slab, complete all as specified and directed Please Enable Macros to View BoQ information |
| 14 | Demolition of reinforcement concrete of any description and in any position for manhole cover slab, complete all as specified and directed Please Enable Macros to View BoQ information |