| 1 | Earth work in trench excavation by manual means in AKS |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40mm nominal size crushed. |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). |
| 6 | Brick work with common burnt clay (non modular) bricks of class designation 7.5 in cement mortar 1:6 (1 cement : 6 fine sand). |
| 7 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete TMT bars. |
| 8 | Providing and fixing aluminium grill in doors windows and vents including fitting of nuts and bolts etc |
| 9 | Providing and laying wet mix macadam of including compacting all complete |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50Mt & lift upto 1.50M. |
| 11 | Hand Packed stone filling including supply of stones |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form work for :- |
| 13 | Foundations, footings, bases of columns. |
| 14 | Suspended floors, roofs, landings and access platforms. |
| 15 | Supply fixing and installation of 3 core heavy duty wire of 25 sqmm of approved brand and manufacture like bajaj heavls etc |
| 16 | Providing/fixing heavy duty interlocking tiles 80 mm thick of M30 grade including locking with 1.1.5:3 cement concrete including carriage from source to site (complete job) |
| 17 | Supply fixing and installation of exhaust fans |
| 18 | Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. 110 mm dia |
| 19 | drain clearence /slip clearence In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 20 | Providing and fixing on wall face unplasticised-PVC moulded fitting / accessories for unplasticised- rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10mm gap for thermal expansion :- |
| 21 | Coupler 110mm. |
| 22 | Single tee with door 110 x 110 x 110mm. |
| 23 | Bend 87.5* 110mm. |
| 24 | Steel work welded in built-up sections/framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required in gratings, frames, guard bar, ladders, railings, brackets, gates and similar work. |
| 25 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. |
| 26 | Sand for an average lead of 120 kms |
| 27 | Stone aggregate fo r an average lead of 20 Kms. |
| 28 | Stone for avg distance of 5 km by MT Please Enable Macros to View BoQ information |