| 1 | Earth work in filling by cartage upto 30lead including all charges etc. |
| 2 | Earth work in excavation in treanches for foundation in ordinary soil inclduding lift upto 1.5 m lead upto 30 m and dressing of sides & faming of bottom & disposal of surplus excavated earth as directed by the engineer in charge within a distance of 30 m S.I. No. 251 |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. |
| 4 | Cement concrete 1:5:10(1 cement :5 C/ sand :10 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors.as per DSR 4.1 PWD SI No. 4.1.10 |
| 5 | Class -150 (non modular) brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials labour and T & P etc. required for proper completion of the work T&P etc. as per DSR 6.1 SI No.6.1.1A |
| 6 | 12mm Cement plaster with Cement moratr in proportion of 1:4 cement & Coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth finished even and smooth as per DSR 13.4 PWD s.no. 13.4.1 |
| 7 | Construction of un - reinforced , plain cement concrete avement thickness as per disign , over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M - 30 ( Grade ) , coarse and fine aggregate conforming to IS 383 , maximum size of coarse aggregate not exceeding 25 mm , mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design , laid in approved fixed side formwork ( steel channel , laying and fixing of 125 micron thick polythene film wedges , steel plates including levelling the formwork as per drawing ) , spreading the concrete with shovels , rakes , compacted using needle , screed and plate vibrators and finished in continuous operation including provision of contraction , expansion , construction and construction ! joints , applying debonding strips , primer , sealant , dowel bars , near approaches to bridge / culvert and construction joints , admixtures as approved , curing of concrete slabs for 14 days , curing compund ( where specified ) and water finishing to lines and grade as per drawing and technical specification clause 1501. ( For Agra ) |
| 8 | R.C.C. work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in the proportion 1:2:4 (one part of cement, two part of coarse sand and four part of 2cm stone grit) in lintels of door and windows excluding supply of reinforcement and its bending and including its fixing and binding the same with 24BWGI bindig wire and including necessary cetering and shuttering etc. including all charges etc. |
| 9 | Providing and cutting & bending of TMT bars for R.C.C. work including all charges etc. |
| 10 | Supply( 80mm Thick ) and fixing of interlocking M-20 Paver tiles over 40mm local sand inclulind cost of all materials labour tolls & plants etc. required for proper complition of the work. DSR Ch. 20 Sl. No. 17 |
| 11 | S/F informatory sing board including all material and labour charges and writing & Painting in both side for proper completion of the work. |
| 12 | ADD GST 18% Please Enable Macros to View BoQ information |