| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification inciuding spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. |
| 2 | Providing and laying Cast in situ/Ready Mix, cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailling out water, formwork, laying/ pumping, compacting and curing, excetra complete, with fully automatic micro processor based Programmable Logic Controller without Supervisory Control and Data Aquisition enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) excetra complete. |
| 3 | Providing and laying Cast in situ / Ready Mix cement concrete in M-15 of trap / granite / quartzite / gneiss metal for plain or moulded sills, cornice, jambs, block in course or architraves of required size and shapes including steel centering, formwork,laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing, excetra complete. |
| 4 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. |
| 5 | Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete. Item / Page No : 30 / 25 |
| 6 | Providing & fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion & liability period etc', having rectangular shape of 1.20m X 0.90m size made out 18 gauge (1.25mm) thick M.S. sheet painted with one coat of Zinc chromate stoving primer & two coats of enamel paint on front side & grey stove enamel on back side & border / messages / symbols etc. |
| 7 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. |
| 8 | Royalty charges for natural sand which is used for government bonafied works and for which Royalty charges are to be paid by the contractor. |
| 9 | Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune. |
| 10 | Compressive Strength of Cement Concrete Cube |
| 11 | GST 18% Please Enable Macros to View BoQ information |