|
| 1 | Ghoda Kakar Lasani Pakka Check dam Nirman |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms , lift upto 1.5m , including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter including stackingg of useful material if available. |
| 3 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering = All work up to plinth level 1:4:8 |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 6 | Random rubble dry stone Kharanja under floor. |
| 7 | Providing and laying in position cement concrete including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering = All work up to plinth level 1:2:4 |
| 8 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. |
| 9 | Devpura tithrda 2 Pakka Check Dam Nirman |
| 10 | Earth work in excavation by mechanical means (Hydraulic Excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms , lift upto 1.5m , including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter including stackingg of useful material if available. |
| 11 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering = All work up to plinth level 1:4:8 |
| 12 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 13 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 14 | Random rubble dry stone Kharanja under floor. |
| 15 | Providing and laying in position cement concrete including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering = All work up to plinth level 1:2:4 |
| 16 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. |
| 17 | Tithrda Devpura 3 Pkka Check dam Nirman |
| 18 | Earth work in excavation by mechanical means (Hydraulic Excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms , lift upto 1.5m , including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter including stackingg of useful material if available. |
| 19 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering = All work up to plinth level 1:4:8 |
| 20 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 21 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 22 | Random rubble dry stone Kharanja under floor. |
| 23 | Providing and laying in position cement concrete including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering = All work up to plinth level 1:2:4 |
| 24 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. Please Enable Macros to View BoQ information |