|
| 1 | Design, Engineering, Procurement, Supply of Materials/ Equipment for two numbers Park Pooling Stations, (2000 MW) as COMPLETE PACKAGE as per scope of work volume-II & as per technical specification volume-III. (For PPS-I & II both i.e. Park Pooling Station-I & II) |
| 2 | 315 MVA, 400/33/33 KV Power Transformers complete with all accessories - as detailed in technical specification (Volume-II & III) |
| 3 | 420 kV, Circuit Breakers for AIS Bays for one and half breaker scheme complete with all accessaries as detailed in technical specification (Volume-II & III) |
| 4 | Indoor type 33 KV Metal Clad Switchboard equiped with VCB's having atleast 8 nos outgoing feeders with all accessories and protection as detailed in technical specification (Volume-II & III) (as per SLD) |
| 5 | Separate metering arrangement for 33 KV consist of 2 set of CT & 1 Set of PT, LA, PQM, Energy meter ( both Check & Main) & GO including all accessaries as per scope of work & technical specification |
| 6 | 160 KVA DG Sets with Emergency LT Switchboard all accessaries as detailed in scope of work & technical specification (volume-II & III) |
| 7 | Tools & Tackles, Measuring & Testing equipment required for each PPS-I & II including Oil Filtration machine, crane etc. as per scope of work & technical specification (volume-II & III) |
| 8 | Equipment / item (i.e. CT, CVT, Isolators, structures, Bus Bars, L.A, PI, WT etc of suitable ratings) for complete the 400 kV/33 kV, Park Pooling Stations of Solar park as detailed in scoope of work & technical specification (Volume-II & III of Tender document) & all other items required to complete the EPC package for each PPS |
| 9 | Control & Relay Panels with BCU, Substation Automation System, SCADA, FOTE, PLCC and Telemetry System for as detailed in scope of work & technical specification (Volume-II & III) for each PPS |
| 10 | Balance packeges/ equipments to complete the PPS-1 & II i.e. Earthing, Illumination, Battery & Battery Charger, DC system, Lightening Protection system, Fire Fighting system and other systems including required hardware, fittings, cables etc as per scope of work & technical specification (volume-II & III) |
| 11 | Power, Instrument & Control Cables, required for each PPS-I & II as per scheme/requirement , scope of work & technical specification (volume-II & III) |
| 12 | Air-Conditioning system for Control room building and ventillation for Switchgear room as per scope of work & technical specification (volume-II & III) required for each PPS I & II |
| 13 | Office and Miscllanious equipment/ item scope of work & technical specification (volume-II & III) required for each PPS-I & II |
| 14 | 02 Nos. 33/0.44 KV, 500 KVA, Station Service Transformers along with LT switchgear, MLDB, LDB, DCDB, as detailed in scope of work & technical specification (volume-II & III) at PPS-I only |
| 15 | 02 Nos. 33/0.44 KV, 1000 KVA, 02 Nos Station Service Transformers along with LT switchgear, MLDB, LDB, DCDB, as detailed in scope of work & technical specification (volume-II & III) at PPS-II only |
| 16 | CIVIL Works (Supply and Construction) |
| 17 | Foundations and Structures of all equipements, roads, rail, trenches, oil pits, fencings, water drainage system, office buildings, stores, guard rooms and all civil works necessary to completion for both PPS-I & II |
| 18 | Erection, Testing, Commissioning of all equipements and systems for Park Pooling Station-I & II |
| 19 | ETC of all equipments mentioned in above clause heading 1 & 2 of BOQ (For both PPS-I & II) |
| 20 | Mandatory spares for all equipment |
| 21 | Mandatory spares for all equipment as per Volume-II for PPS-I |
| 22 | Mandatory spares for all equipment as per Volume-II for PPS-II Please Enable Macros to View BoQ information |