|
| 1 | Construction of TALAB |
| 2 | PROVIDING COST OF DEWATERING INCLUDING COST OF BORING LAYING OF 4\\" DIA PVC PIPE HIRE CHARGE OF 7.50 K.V. DEISEL PUMPING SET. HIRE CHARGES OF P.V.C. PIPE AND COST OF 4* DIA PLASTIC PIPE FOR DISPOSAL OF WATER AS REQUIRED DISTANCE ALSO INCLUDING WAGES OF REPAIRING LEAKAGE DURING OPERATION HIRE CHAGES OF TRACTOR INCLUDING LOADING AND UNLOADING OF PUMPING SET. |
| 3 | EXCAVATION IN FOUNDATION IN ORDINARY SOIL INCLUDING FILLING LIFT UPTO 1.5M AND LEAD UPTO 30M AND INCL. FILLING WATERING AND RAMMING OF EXCAVATED EARTH INTO THE TREANCHES OR INTO THE SPACE BETWEEN THE BUILDING AND THE SIDE OF FOUNDATION TREANCHES OR PLINTH AND REMOVAL AND DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER -IN-CHARGE UPTO A DISTANCE OF 30M FROM THE FOUNDATION TRENCHES INCL. ALL T&P PHOWASK AND BASKED ETC OMP. |
| 4 | ADD ITEMS 251 TO 253 FOR EVERY ADDITIONAL 30M LEAD OR PART OF 30M OR FOR EVERY ADDITIONAL 1.5M LIFT OR PART OF 1.5M |
| 5 | ADD ITEMS 251 TO 253 FOR EVERY ADDITIONAL 30M LEAD OR PART OF 30M OR FOR EVERY ADDITIONAL 1.5M LIFT OR PART OF 1.5M |
| 6 | SAME AS ABOVE ITEM NO. 2 BUT ONE CHANGE EXTRA LIFT IN BC SOIL INCLUDING ALL COMP. |
| 7 | CARTAGE AND DISPOSAL OF SURPLUS MALWA UPTO 5KM DISTANCE FROM THE SITE……..COMPLETED AS PER DIRECTION OF ENGINEER IN CHARGE |
| 8 | PROVIDING AND LAYING SPREADING AND COMPACTING STONE AGGRIGATE OF SPECIFIC SIZE TO WATER BOUND MACADAM SPECIFICATION INCLUDING SPREADING IN UNIFORM THICKNESS HAND PACKING ROLLING WITH THREE WHEEL 80-100KN STATIC ROLLER IN STAGE TO PROPER GRADE AND CAMBER APPLYING AND BROOMING. CRUSHABLE SCREENING TO FILL UP THE INTERSTICS OF COARSE AGGRIGATE WATERING AND COMPACTING TO THE REQUIRED DENSITY GRADING 3 AS PER TECHNICAL SPECIFICATION CLAUSE 405. |
| 9 | CEMENT WITH 4CM GUAGE STONE BALLAST OF 1.25 F.N. AND CEMENT IN PROP. OF 1:5:10 FOUNDATION AND UPER FLOOR INCLUDING SUPPLY OF ALL MAT. LABOUR T&P ETC REQUIRED FOR PROPER COMPLETION OF THE WORK SI 274 |
| 10 | STONE WORK RCR (1:4) FONDATION / SUPERSTRUCTURE PAGE NO. 22 |
| 11 | STRUCK POINTING WITH 1:2 C/S MORTAR I/C S/O ALL MAT. LAB AND T & P ETC COMP. AS PER SI NO. 574 |
| 12 | CEMENT CONCRETE WITH 2CM GUAGE APPROVE STONE BALLAST APPROVED COARSE SAND AND CEMENT IN PROP. OF 4:2:1 INCLUDING SUPPLY OF ALL MAT. LABOUR T&P ETC REQUIRED FOR PROPER COMPLETION OF THE WORK SI 279 |
| 13 | Ist CLASS BRICK WORK IN 4:1 FINE SAND AND CEMENT OF 1.25 FINENESS MODULUS MORTAR IN FOUNDATION AND PLINTH INCL. SUPPLY OF ALL MAT. T&P ETC REQUIRED FOR PROPER COMPLETION WORK |
| 14 | SAND FILLING IN PLINTH INCLUDING SUPPLY OF NECESSORY QUALITY OF SAND FROM A DISTANCE NOT EXCEEDING 8KM FROM THE SITE OF WORK AND INCLUDING WATERING DRESSING ETC. RATE TO INCLUDE COST OF ALL MAT. LABOUR T&P ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK. |
| 15 | CHEQUERRED PRECAST CEMNET CONCRETE TILES 22MM THICK IN FOOTPRINT CONSTRUCTED JOINT WITH NEAT CEMENT SLURRY MIXED WITH PIGMENT TO MATCH SHADE OF INCL. RUBBING AND CLEANING ETC COMPLETE ON 20MM THICK BED OR CEMENT MORTAR 1:4 LIGHT SHADE PIGMENT USING WHITE CEMENT ETC |
| 16 | MILD STEEL OR IRON WORK OF SMALL SIZES AND SECTIONS AND SUCH AS HOLDING DOWN BOLTS HOLD FASTS THE RODS GRATING ETC WROUGHT TO REQUIRED FROM INCLUDING SUPPLY OF STEEL BOLTS NUTS AND WASTAES ETC. AND THEIR FIXING REQUIRED FOR COMPLETION OF WORK |
| 17 | EARTH WORK IN EMBANKMENT IN MOORAM MIXED/BLACK COTTON SOIL. EXCAVATION TO BE IN THE FROM OF REGULAR PITS NOT EXCEEDING 0.5M IN DEPTH AND EARTH WORK IN EMBANKMNET TO BE IN 20CM LAYER INCL. AND DRESSING THE SURFACE TO REQUIRED LEVEL AND STONPE AND ALSO i/c 1.5m LIFT AND 30M CARGATE RATE UPTO |
| 18 | SUPPLY AND FIXING OF THREE SEATER CHAIR AS PER DIRECTION OF ENGINEER IN-CHARGE |
| 19 | SUPPLY AND FIXING OF TWO SEATER CHAIR AS PER DIRECTION OF ENGINEER IN-CHARGE |
| 20 | HORTICULTURE AND PLANTATION OF TREE ……..AS PER MR INCLUDING OF TRANSPORTATION |
| 21 | S/I SOLAR LIGHT LED SOLAR MODULE 75 WATT BATRY 12V 75. AH TUBULAR PLATE LUMINARE 12 WATT LED POLE FRAME BATARY BOX ETC COMPLETE SET AS 5 YEAR COMPREHNSIVE WARANTY |
| 22 | STONE BOUNDRY PITCHING IN APRON INCL. COST OF LABOUR T&P ETC REQUIRED PROPER COMPLETION OF WORK 1.0 Please Enable Macros to View BoQ information |