| 1 | nSoh; vkink ¼vkW/kh&rqQku cjlkr bR;kfn½ esa fu;fer :Ik ls gksus okyh {kfrxzLrrk] ,oa ejEer dk;ksZa ¼33 ds0oh0] 11 ds0oh0] ,y0Vh0 ykbuksa dk dk;Z½ |
| 2 | Safe Loading, Carriage & Unloading of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 0-50 km |
| 3 | Safe Loading, Carriage & Unloading of PCC 11 Mtr Long From Electricity Store Center Maharajganj to Work SiteDistance 0-50 km |
| 4 | Safe Loading, Carriage & Unloading of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 0-50 km |
| 5 | Safe Loading, Carriage & Unloading of ACSR Weasel conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 6 | Safe Loading, Carriage & Unloading of ACSR Dog conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 7 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x50+1x35+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 8 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x95+1x70+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 9 | Safe Loading, Carriage & Unloading of 11 kv line material (Cross arm, Dics & pin insulator with all fittings). |
| 10 | Safe Loading, Carriage & Unloading of 33 kv line material (Cross arm, Dics & pin insulator with all fittings). |
| 11 | Safe Loading, Carriage & Unloading of Earthing Complete from Electricity Store Center Maharajganj to Work Site |
| 12 | Safe Loading, Carriage & Unloading of Stay Set Complete from Electricity Store Center Maharajganj to Work Site |
| 13 | Safe Loading, Carriage & Unloading of LT Distribution Box from Electricity Store Center -Maharajganj to Work Site |
| 14 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 15 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 16 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 17 | Erection of 11 mtr Single ST Pole with all accessories (Cross arm, pin insulator with pin, F-bracket etc.) as per specification. |
| 18 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 19 | Erection of 11 mtr Single PCC Pole with all accessories (Cross arm, 11 KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 20 | Erection of 11 mtr Double ST Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 21 | Erection of 8.5 mtr Double PCC Pole structure with all accessories (11 KV Disc with Disc fittings, 11 KV Pin insulator with pin etc.) as per specification. |
| 22 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 23 | Plinth of 11 mtr ST Pole as per specification. |
| 24 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 25 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 26 | Earthing Complete of 11 Mtr ST Pole as per specification. |
| 27 | Earthing Complete of 11 Mtr PCC Pole as per specification. |
| 28 | Earthing Complete of 8.5 Mtr PCC Pole as per specification. |
| 29 | Laying sagging and binding of of ACSR Weasel Conductor on eracted pole |
| 30 | Laying sagging and binding of of ACSR Dog Conductor on eracted pole |
| 31 | Laying of guarding between erected ST Poles as per specification. |
| 32 | Laying of LT ABC of Size (3x50+1x35+1x16) on erected LT. Pole |
| 33 | Laying of LT ABC of Size (3x95+1x70+1x16) on erected LT. Pole |
| 34 | Erection of Distribution Box on erected pole as per specification |
| 35 | Concreting of stay set as per specification |
| 36 | Intallation of Stay set complete as per specification |
| 37 | Providing and Installation of MS Top Channel of size (125x65x2240mm) on erected double pole. |
| 38 | Providing and Installation of MS Dropper Channel of size (100x50x2028mm) |
| 39 | Providing and Installation of T/F MS base Angle of size 75x75x6x2028mm with clamp on erected double pole. |
| 40 | Providing and Installation of Eye bolt as per specification. |
| 41 | Providing and Installation of Eye Hook as per specification. |
| 42 | Providing and Installation of Suspension Clamp |
| 43 | Providing and Installation of Dead End Clamp |
| 44 | Providing and Installation of Peircing Connector |
| 45 | Providing and Installation of V-type X-arm holding clamp with nut bolt |
| 46 | Providing and Installation of F bracket on erected PCC/ST Pole |
| 47 | Providing and Installation of Top Channel Clamp |
| 48 | Providing and Installation of T-Off Channel Clamp |
| 49 | Providing and Installation of Stay Clamp |
| 50 | Providing and Installation of Droper Angle Clamp |
| 51 | Providing and Installation of Top/T-off/Droper Chanel Clamp with nut bolts and washer |
| 52 | Providing and Installation of Nut & Bolt |
| 53 | providing and installation of PG Clamp |
| 54 | Tree Branch Cutting/chopping along the HT/LT Line route Please Enable Macros to View BoQ information |