| 1 | 33 ds0oh0@11 ds0oh0 ,oa 0 ,y0Vh0 ykbZuksa dh vkdfLed {kfrxzLrrk dk dk;ZA |
| 2 | Safe Loading, Carriage & Unloading of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 3 | Safe Loading, Carriage & Unloading of PCC 11 Mtr Long From Electricity Store Center Maharajganj to Work SiteDistance 70-110 km |
| 4 | Safe Loading, Carriage & Unloading of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 5 | Safe Loading, Carriage & Unloading of PCC 9 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 6 | Safe Loading, Carriage & Unloading of ACSR Weasel conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 7 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x50+1x35+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 8 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x95+1x70+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 9 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x120+1x95+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 10 | Safe Loading, Carriage & Unloading of Earthing Complete from Electricity Store Center Maharajganj to Work Site |
| 11 | Safe Loading, Carriage & Unloading of Stay Set Complete from Electricity Store Center Maharajganj to Work Site |
| 12 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 13 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 14 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 15 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (09 Mtr Long) as per drawing. |
| 16 | Erection of 11 mtr Single ST Pole with all accessories (Cross arm, pin insulator with pin, F-bracket etc.) as per specification. |
| 17 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 18 | Erection of 9 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 19 | Erection of 11 mtr Single PCC Pole with all accessories (Cross arm, 11 KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 20 | Erection of 11 mtr Double ST Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 21 | Erection of 11 mtr Double PCC Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 22 | Erection of 09 mtr Double PCC Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 23 | Erection of 8.5 mtr Double PCC Pole structure with all accessories (11 KV Disc with Disc fittings, 11 KV Pin insulator with pin etc.) as per specification. |
| 24 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 25 | Plinth of 11 mtr ST Pole as per specification. |
| 26 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 27 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 28 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 29 | Earthing Complete of 11 Mtr ST Pole as per specification. |
| 30 | Earthing Complete of 11 Mtr PCC Pole as per specification. |
| 31 | Earthing Complete of 9 Mtr PCC Pole as per specification. |
| 32 | Earthing Complete of 8.5 Mtr PCC Pole as per specification. |
| 33 | Laying sagging and binding of of ACSR Weasel Conductor on eracted pole |
| 34 | Laying of guarding between erected ST Poles as per specification. |
| 35 | Laying of LT ABC of Size (3x50+1x35+1x16) on erected LT. Pole |
| 36 | Laying of LT ABC of Size (3x95+1x70+1x16) on erected LT. Pole |
| 37 | Laying of LT ABC of Size (3x120+1x95+1x16) on erected LT. Pole |
| 38 | Concreting of stay set as per specification |
| 39 | Intallation of Stay set complete as per specification |
| 40 | Providing and Installation of MS Top Channel of size (100x50x2240mm) on erected double pole. |
| 41 | Providing and Installation of MS Dropper Channel of size (100x50x2000mm) |
| 42 | Providing and Installation of J-Hook as per specification. |
| 43 | Providing and Installation of Eye Hook as per specification. |
| 44 | Providing and Installation of Suspension Clamp |
| 45 | Providing and Installation of Dead End Clamp |
| 46 | Providing and Installation of Peircing Connector |
| 47 | Providing and Installation of F bracket on 11 kv erected PCC/ST Pole |
| 48 | Providing and Installation of F bracket on 33 kv erected PCC/ST Pole |
| 49 | Providing and Installation of Top Channel Clamp |
| 50 | Providing and Installation of T-Off Channel Clamp |
| 51 | Providing and Installation of MS Guarding Angle with clamp |
| 52 | Providing and installation of PG Clamp |
| 53 | Providing and Installation of Stay Clamp |
| 54 | providing and Installation of cross arm holding clamp with bolt and nut |
| 55 | Providing and Installation of Top/T-off/Droper Chanel Clamp with nut bolts and washer |
| 56 | Providing and Installation of Danger Board on erected PCC/ST Pole |
| 57 | Providing and Installation of Nut & Bolt |
| 58 | Providing and Installation of LT shackle insulator |
| 59 | Providing and Installation of Stone pad |
| 60 | Dismantling of pole (PCC 8.5m/11m/11m STP/) transformer and other line item and submission to store maharajganj. |
| 61 | Tree Branch Cutting/chopping along the HT/LT Line route Please Enable Macros to View BoQ information |