|
| 1 | SOR ITEMS |
| 2 | NON SOR ITEMS |
| 3 | Manpower for Repair and Maintenance Servicing |
| 4 | Supply Portion |
| 5 | Hiring of Vehicles |
| 6 | Engagement of Expert Manpower |
| 7 | SOR ITEMS |
| 8 | DSR-2012 Item:1.10.3 |
| 9 | DSR-2012 Item:1.14.2 |
| 10 | DSR-2012 Item:1.14.8 |
| 11 | DSR-2012 Item:1.14.10 |
| 12 | DSR-2012 Item:1.21.2 |
| 13 | DSR-2012 Item:1.24.1 |
| 14 | DSR-2012 Item:1.24.3 |
| 15 | DSR-2012 Item:1.24.4 |
| 16 | DSR-2012 Item:1.24.5 |
| 17 | DSR-2012 Item:1.24.8 |
| 18 | DSR-2012 Item:1.27.1 |
| 19 | DSR-2012 Item:1.27.2 |
| 20 | DSR-2012 Item:1.27.3 |
| 21 | DSR-2012 Item:1.27.4 |
| 22 | DSR-2012 Item:1.27.5 |
| 23 | DSR-2012 Item:1.27.6 |
| 24 | DSR-2012 Item:1.28.5 |
| 25 | DSR-2012 Item:1.28.6 |
| 26 | DSR-2012 Item:2.3.1 |
| 27 | DSR-2012 Item:2.3.3 |
| 28 | DSR-2012 Item:2.6.2 |
| 29 | DSR-2012 Item:2.10.1 |
| 30 | DSR-2012 Item:2.10.3 |
| 31 | DSR-2012 Item:2.10.4 |
| 32 | DSR-2012 Item:2.14.1 |
| 33 | DSR-2012 Item:2.15.3 |
| 34 | DSR-2012 Item:2.16 |
| 35 | DSR-2012 Item:2.18 |
| 36 | DSR-2012 Item:2.19 |
| 37 | DSR-2012 Item:5.2 |
| 38 | DSR-2012 Item:5.9 |
| 39 | DSR-2012 Item:5.15 |
| 40 | DSR-2012 Item:6.1 |
| 41 | DSR-2012 Item:7.1.1 |
| 42 | DSR-2012 Item:7.1.2 |
| 43 | DSR-2012 Item:7.1.3 |
| 44 | DSR-2012 Item:7.1.4 |
| 45 | DSR-2012 Item:7.10 |
| 46 | DSR-2012 Item:8.5.2 |
| 47 | DSR-2012 Item:9.1.20 |
| 48 | DSR-2012 Item:9.1.21 |
| 49 | DSR-2012 Item:9.1.22 |
| 50 | DSR-2012 Item:9.1.23 |
| 51 | DSR-2012 Item:9.1.24 |
| 52 | DSR-2012 Item:9.1.25 |
| 53 | DSR-2012 Item:9.1.26 |
| 54 | DSR-2012 Item:9.1.33 |
| 55 | DSR-2012 Item:9.3.29 |
| 56 | DSR-2012 Item:9.3.18 |
| 57 | DSR-2012 Item:9.3.20 |
| 58 | DSR-2012 Item:9.3.21 |
| 59 | DSR-2012 Item:9.3.22 |
| 60 | DSR-2012 Item:9.3.23 |
| 61 | DSR-2012 Item:10.7.3 |
| 62 | DSR-2012 Item:10.8.3 |
| 63 | DSR-2012 Item:10.9.3 |
| 64 | DSR-2012 Item:11.1.3 |
| 65 | DSR-2012 Item:13.6 |
| 66 | DSR-2012 Item:13.23 |
| 67 | DSR-2012 Item:13.25 |
| 68 | DSR-2012 Item:14.13.3 |
| 69 | DSR-2012 Item:2.21 |
| 70 | DSR-2012 Item:2.22 |
| 71 | DSR-2012 Item:12.42 |
| 72 | DSR-2012 Item:2.14.3 |
| 73 | NON SOR ITEMS |
| 74 | Supply and Fixing of air cooler pump. ( |
| 75 | Supply and Fixing of air cooler fan mot |
| 76 | Maintenance of water leakage of air cool |
| 77 | Supply and Fixing of capacitor. ( Prefer |
| 78 | Servicing of cooler (cleaning, tightenin |
| 79 | Supply and fixing of bottom roller of ai |
| 80 | Water submersible Pump/Motor maintenance |
| 81 | Repairing of pump starter. |
| 82 | Supply and Fixing of Geyser thermostat |
| 83 | Supply and Fixing of Geyser heating coi |
| 84 | Servicing of Geyser (cleaning, tightenin |
| 85 | Supply and Fixing of Geyser indicating l |
| 86 | Shifting of DG set up to 250 KVA, feed |
| 87 | Shifting of DG set up to 250 KVA, feeder |
| 88 | Shifting of DG set up to 250 KVA, feeder |
| 89 | Shifting of cable drum 33 KV grade, ACSR |
| 90 | Shifting of cable drum upto 33 KV grade, |
| 91 | Overhauling of fans |
| 92 | Rewinding of fan-motor |
| 93 | P/F of Ball Bearing: |
| 94 | P/F of Bush Bearing: |
| 95 | P/F of 2.5 MFD Capacitor: |
| 96 | Erection,Testing, commissioning of 11 KV |
| 97 | Energy meter installation with Co-ordina |
| 98 | Attending Electrical faults and executin |
| 99 | P/F of good quality switch boards of 4' |
| 100 | P/F of switch boards - 8'x12', 10'x12', |
| 101 | Repairing and Maintenance of voltage sta |
| 102 | Decorative lighting arragnement work by |
| 103 | Repair and Maintenance Servicing |
| 104 | Operation,Repair& Maint at CBCMP |
| 105 | Wage Escallation Charges for Deployed HS |
| 106 | Deployment of Unskilled Manpower: |
| 107 | Supply Portion |
| 108 | Supply of Angle Holder |
| 109 | Supply of Copper Lugs 25 Sq. Mm |
| 110 | Supply of Copper Lugs 35 Sq. Mm |
| 111 | Supply of Copper Lugs 16 Sq. Mm |
| 112 | Supply of Copper Lugs 50 Sq. Mm |
| 113 | Supply of Copper Lugs 95 Sq. Mm |
| 114 | Supply of Copper Lugs 120 Sq. Mm |
| 115 | Supply of Bus Bar Copper 100 Amp. 415 (T |
| 116 | Supply of SFU 125 Amp TPN |
| 117 | Supply of SS wire rope for 25 m. high |
| 118 | Supply of timer for 25 m. HM contro |
| 119 | Supply of Foundation bolt for High Mast |
| 120 | Supply of contractor for 25 m. HM |
| 121 | LED BSD PANL LIGHT (2X2) 36 W RECES/SURF |
| 122 | CHANGE OVER SWITCH,300AMP,415V,4 POLE |
| 123 | 3 PIN PLUG TOP 6A 240V |
| 124 | PLUG TOP 15 AMERE 230V 3 PIN |
| 125 | LAMP LED: COOL DAY,2PIN,4FT,180-260V,20W |
| 126 | LAMP LED:COOL DAY 2-PIN:GLOVE:250VAC,15W |
| 127 | LED BASED 15W DOWNLIGHTER FITTING |
| 128 | Supply of MCCB 250 Amp |
| 129 | Supply of MCCB 125 Amp |
| 130 | Supply of Switch 5/6 Amp Modular |
| 131 | Supply of Socket 5/6 Amp 3/5 pin |
| 132 | Supply of Switch 16/20 Amp |
| 133 | Supply of Socket 16/20 Amp 3/5 pin |
| 134 | Supply of MCB 16 Amp SP |
| 135 | Supply of MCB 25 Amp SP |
| 136 | Supply of MCB 32 Amp SP |
| 137 | Supply of MCB 63 Amp 4P |
| 138 | Casing Caping PVC 25 mm |
| 139 | Conduit PVC for Wiring 25 mm |
| 140 | RCCB 4P 63A 300 mA |
| 141 | RCCB 2P 40 A 30mA |
| 142 | Ding Dong Bell |
| 143 | Fancy batten Holder Metal Ring |
| 144 | Paints Premium Enamle |
| 145 | Paints Silver Metallic |
| 146 | Fan Regulator |
| 147 | Hiring of Vehicles |
| 148 | Hiring of Hydra capacity 14 ton for loa |
| 149 | Hiring of JCB : Hiring of JCB : |
| 150 | Hiring of Tractor |
| 151 | Hiring of Utility vehicle |
| 152 | Cost of HSD & Others |
| 153 | Engagement of Expert Manpower |
| 154 | Engagement of Expert Manpower Please Enable Macros to View BoQ information |