| 1 | Earth work for Excavation in Foundation in Dry soil including lift up to 1.5m and lead up to 30 m. and including back filling, Watering ,rammimg and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. Complete But excluding G.S.T. |
| 2 | Cement concrete 1:3:6 in foundation in cement, coarse sand, stone grit 20 to 40 mm i/c cost of all Material Labour and T & P etc. |
| 3 | Brick Work(M-105) in 1:3 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. Complete |
| 4 | Reinforcement Cement Concrete 1:1.5:3 in cement coarse sand and stone grit 20 mm gauge mechanical mixing and laying in slab with all material , labour , T&P etc. Required for the proper complition of work |
| 5 | Steel Reinforcement Work i/c Supplying, Cutting, Bending, Binding & Placing of i/c cost of binding wire and Labour,T&P etc complete. |
| 6 | Centering& Shuttering work for CC work i/c cleaning & oiling etc complete for proper compelition of work. |
| 7 | Centering& Shuttering work for RCC work i/c cleaning & oiling etc complete for proper compelition of work. |
| 8 | Struck Cement Pointing (struck deep) in 1:2 cement sand mortar i/c cost of all Material Labour and T&P etc. as per direction in charge |
| 9 | Suppling & Fixing Tarfelt on Abutment Cap i/c all cost of material, T&P etc for Proper complition of work. |
| 10 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. |
| 11 | Suppling & Fixing Expension joint filled with bitumen & Coarse sand i/c all cost of material, T&P etc for Proper complition of work. |
| 12 | Earth Work In filling Ramp and making Diversion by ordinary soil including manual compaction, ramming, and dressing upto The level Of V.R.B. Level I/C All Cost Of Labour T&P etc Complete . |
| 13 | E/W in Removal for diversion and deposited on Banks of canal i/c ramming & dressing as dirceted by E.I.C. |
| 14 | Providing Brick on edge Soling Including cost of all labour and T&P etc but i/c cost of bricks Complete. |
| 15 | Dismantling of Brick on edge Soling form road including cost of all labour and T&P etc. Complete. |
| 16 | Suppling & Fixing wheel guard piller(230x230x900mm) i/c all cost of material, T&P etc for Proper complition of work. |
| 17 | Providing of Mild steel sign board size 1200x900mm including Erection and writing work Please Enable Macros to View BoQ information |